The Project Implementing Entity has finalized the terms of reference for the recruitment of key personnel. [...] The terms of reference for the elaboration of key studies are being finalized, including the vulnerability assessment and airfield resilience plan and the design study for Hewanorra International Airport’s airfield improvements. [...] IN00891183 ►Modernization of air navigation systems and oversight (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 3.00 Date 31-Mar-2020 -- 10-Sep-2020 30-Jun-2027 11/13/2020 Page 2 of 9 The World Bank Implementation Status & Results Report Saint Lucia - Caribbean Regional Air Transport Connectivity Project (P170860) Air traffic monitoring and control capa [...] Enhance resilience of Saint Lucia’s airport infrastructure to natural disasters IN00891182 ►Change in discharge capacity of the runway drainage system at UVF (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 100.00 Date 31-Mar-2020 -- 10-Sep-2020 30-Jun-2027 Change in discharge capacity of the runway drainage system at UVF due to the drainage improvemen [...] The baseline value of the discharge capacity will be set by the design study.
Authors
- Disclosure Status
- Disclosed
- Doc Name
- Disclosable Version of the ISR - Saint Lucia - Caribbean Regional Air Transport Connectivity Project - P170860 - Sequence No : 01
- Document Date
- 2020-11-13
- Originating Unit
- Transport-LAC (ILCT1)
- Published in
- United States of America
- Rel Proj ID
- P170860,LC-Saint Lucia - Caribbean Regional Air Transport Connectivity Pro -- P170860
- Total Volume(s)
- 1
- Unit Owning
- Transport-LAC
- Volume No
- 1