cover image: Vietnam - Vinh Phuc Flood Risk and Water Management Project : Resettlement Plan (Vol. 5) : Resettlement Action Plan for Ngu Kien Pumping Station, Retention Lake, and Inlet Canals Subproject

20.500.12592/67780h

Vietnam - Vinh Phuc Flood Risk and Water Management Project : Resettlement Plan (Vol. 5) : Resettlement Action Plan for Ngu Kien Pumping Station, Retention Lake, and Inlet Canals Subproject

1 Dec 2020

The development objective of the Vinh Phuc Flood Risk and Water Management Project for Vietnam is to strengthen flood risk management capacity and improve wastewater management in the central catchment of Vinh Phuc Province. Some of the negative impacts and mitigation measures include: (1) cash compensation at replacement cost (free from taxes and transaction costs) for the affected area of the land; (2) compensation for loss of land in cash at: (i) replacement cost to the legal and legalizable land users; and (ii) an financial assistance of an agreed amount to the land users not having recognizable land use right; (3) compensation for other structures and fixed assets will be at full replacement cost and will be in cash; (4) for annual and perennial standing crops or trees, aquaculture products regardless of the legal status of the land, compensation in cash will be paid to the affected persons, who cultivate the land, at full replacement cost in local markets to ensure the compensation is sufficient to replace the lost standing crops, trees, or aquaculture products; (5) either in: (i) cash compensation to cover the cost of restoring the facilities or (ii) in kind compensation based on the negotiation between district Carc and owners of assets; (6) affected households losing more than 70 percent of their agricultural land acquired will be assisted for 12 months if the remaining land is viable for continued use, and for 24 months in case the remaining land is rendered unviable and entire land is acquired by the project; and (7) for landless households, assistance through provision of an apartment that project affected person (PAP) can either pay in installment to buy or rent it for living.
environment public health rural area household income involuntary resettlement natural disaster public debt foreign direct investment natural resources agricultural land community participation exchange rates gender mainstreaming hydrology land administration natural disasters the disabled population size public services social policy statistical data vietnam water resources water resource management social impact public consultation transport network economic region skin disease residential area mode of production water pollution control institutional strengthening social network water use wastewater treatment plant institutional framework rehabilitation assistance dengue fever river basin vocational college household structure valuation method land area age structure female population living standard socioeconomic status social policies storm water non-governmental organization energy source water demand management pumping station flood damage aquatic life power company flood plain land owner industrial park water and food supply external monitoring east asia and pacific mitigation measure quality review eligibility criterion water sector communities and human settlements poor household vulnerable household labor influx land acquisition and resettlement affected households grievance redress mechanism positive impact resettlement activities affected persons source income water management system construction and rehabilitation source of income sludge disposal sanitation conditions agricultural activity loss of income resettlement action plan loss of asset resettlement policy framework access to asset average household replacement cost compensation payment baseline data industrial zone displaced person resettlement impacts lack of infrastructure eligibility requirement sluice gate administrative fee waste disposal site concessional loan transparent manner basic infrastructure nonstructural measures sustainable water creating job opportunity host communities consultation meeting method of valuation household head female-headed household affected population working age local transportation annual per capita income production activity significant loss rural village counterpart fund resettlement assistance flood early warning flood risk management crop value wastewater collection and treatment other asset monitoring agency health clinic health clinics basic social service internal monitoring comments and feedback income source integrated management government fund health station production system emergency response system legal right socioeconomic development income generation activities government law agriculture and industry serious impacts agricultural land area household sanitation land use right compensation for loss agricultural production loss tourist site management board accurate information river management irrigation purpose mountainous area severity of impact large lakes discharge capacity restoration measure infrastructure system regional water local income residential land social relationship near poor elderly household income restoration polluted water leisure activity productive land secondary sources survey period compensation policy ethnic minority household cultural relic water surface low elevation fast economic growth rice crop construction of flood control river system secondary school graduate total sample income and expenditure temporary access road deterioration of infrastructure vocational training course automatic water quality monitoring station unused land inland rivers flood warning pollution incident small pumping station resettlement evaluation disclosure policy big river water issue provincial poverty incidence vocational center integrated regulation irrigation land agricultural land acquisition legal framework for resettlement local drainage system restoration program investment amount cultural house transportation,public administration,water, sanitation and waste management commune clinic daily market orphan child annual cropland canal design public administration - water, sanitation and waste management,other transportat red cros ethnic society

Authors

Vietnam

Disclosure Status
Disclosed
Doc Name
Resettlement Action Plan for Ngu Kien Pumping Station, Retention Lake, and Inlet Canals Subproject
Document Date
2020-04-01
Loan no
86140
Originating Unit
World Bank Office: Hanoi (EACVF)
Published in
United States of America
Rel Proj ID
VN-Vinh Phuc Flood Risk And Water Management Project -- P152460
Total Volume(s)
6
Unit Owning
N/A
Version Type
Revised
Volume No
5

Files

Related Topics

All