cover image: Iraq - Emergency Operation Development Project : Environmental Assessment (Vol. 26) : Environmental and Social Management Plan for Drinking Water Network, Street Lighting, Road Rehabilitation, and Storm Water Drain Project, Mosul, Ninawa Governorate

20.500.12592/p8t8cq

Iraq - Emergency Operation Development Project : Environmental Assessment (Vol. 26) : Environmental and Social Management Plan for Drinking Water Network, Street Lighting, Road Rehabilitation, and Storm Water Drain Project, Mosul, Ninawa Governorate

15 Jun 2020

The development objective of Emergency Operation Development Project for Iraq is to support the country in the reconstruction of damaged infrastructure and the restoration of public services delivery in Targeted Municipal Areas. Some of the negative impacts include : i) noise level and deterioration of air quality resulting from the rehabilitation activities; ii) contamination of soil and water drainage channel by construction and municipal waste generated and stored within the site; Some of the mitigation measures include : i) machines and equipment are periodically checked and maintained to ensure their good working condition; ii) equipment must be kept in good working order and where appropriate fitted with silencers which are kept in good working order; iii) wastewater from the worker rest areas or construction offices should be contained in solid bottom containers and should be removed regularly from site by means of authorized contractors. the wastewater should be disposed in wastewater treatment plants as determined by the municipality; iv) to prevent soil contamination by oil/grease spills, leakages or releases, all manipulations of oil derivatives in the process of construction and provision of the fuel to the machines should be performed with maximum care; v) minimize waste generation on site; vi)Provide information, through appropriate signage, to the bridge users to use the alternative route and upgrade the alternative route to be able to receive the additional number of vehicles. vii) qualified personnel must be employed for the construction equipment, and personnel must be trained for health and safety issues.
carbon monoxide water rights stakeholder engagement health facility water infrastructure iraq cultural heritage rural development middle east and north africa organic carbon construction equipment hydrology industry water resources public safety international convention public consultation physical environment water supply and sanitation geographic information system safeguard policy institutional framework water transport labor markets polymerase chain reaction millennium development goal waste generation legal framework global environment nitrogen oxide national policy natural resources and blue economy health care services industry sound level social protections and labor community health and safety project duration safeguard policies grievance redress mechanism construction phase access to basic service stakeholder consultation stakeholder identification water pipeline construction material flora and fauna rural labor markets project affected persons job opportunity job opportunities labor health and safety conditions biological environment monitoring plan baseline conditions public administration,energy and extractives,water, sanitation and waste managem storm water drainage street light road pavement pollution load drinking water networks industrial area administrative framework important buildings leaving world bank energy transmission and distribution,other water supply, sanitation and waste ma noise limit dissolved solid water utility services to the poor water allocation and water supply

Authors

EcoConServ Environmental Solutions

Disclosure Status
Disclosed
Doc Name
Environmental and Social Management Plan for Drinking Water Network, Street Lighting, Road Rehabilitation, and Storm Water Drain Project, Mosul, Ninawa Governorate
Document Date
2020-05-01
Loan no
85200
Originating Unit
World Bank Office: Beirut (MNCLB)
Published in
United States of America
Rel Proj ID
IQ-Emergency Operation For Development -- P155732
Total Volume(s)
26
Unit Owning
N/A
Version Type
Final
Volume No
26

Files

Related Topics

All