Ukraine - Second Power Transmission Project : Environmental Assessment (Vol. 6) : Environmental and Social Management Plan for Rehabilitation of SS 330 kV Sumy

9 Jul 2020

The development objective of the Second Power Transmission Project for Ukraine is to improve the reliability of power transmission system and support implementation of the wholesale electricity market in Ukraine. Some of the negative impacts and mitigation measures include: (1) cutting of large metal equipment will be carried out by a water jet or by arc-air torches for significant reduction of dust generation; (2) placing noise-protective barriers and providing workers with ear plugs as a protective measure; (3) ensure the presence of special containers for household and construction waste in workplaces and sites with appropriate markings and designation of hazard class; (4) temporary storage of hazardous and toxic materials such as fluorescent lamps, paint, oils, etc., determined on the basis of the classifier as hazardous materials, shall be stored on specific storage site in the territory of substation in a specially designated area; (5) the use of pesticides in soil preparation (such as preparation of pedestals for equipment, access roads, etc.) is prohibited. Preparation and cleaning of the ground will be carried out by mechanical or manual methods; (6) in order to reduce the pollution of water by petroleum products (fuel from motor vehicles), drainage of rain water from the territory should be carried out through a system of tanks with oil and sand traps in the municipal sewage system; and (7) premises for personnel are equipped with fire extinguishers, in the territory the necessary number of boards with fire-prevention equipment should be installed.
ukraine water climate change mitigation europe and central asia hydrology transport water resources jobs labor markets transport services global environment energy and extractives climate change mitigation and green house gases social protections and labor environment and natural resources energy transmission and distribution,public administration - energy and extracti

Authors

Ukraine

Disclosure Status
Disclosed
Doc Name
Environmental and Social Management Plan for Rehabilitation of SS 330 kV Sumy
Document Date
2019-06-05
Loan no
84620
Originating Unit
ECA ENR PM (SCAEN)
Published in
United States of America
Rel Proj ID
UA-Second Power Transmission Project -- P146788
Total Volume(s)
6
Unit Owning
N/A
Version Type
Final
Volume No
6

Files

Related Topics

All