cover image: http://cdn.cseindia.org/attachments/0.71937300_1721100718_implementation-challenges-of-the-pm-kusum-scheme

http://cdn.cseindia.org/attachments/0.71937300_1721100718_implementation-challenges-of-the-pm-kusum-scheme

15 Jul 2024

Under IPS, the capacity of the solar power plant can be twice the capacity of the farmers’ existing water pumps in kW so that farmers can sell the excess electricity generated back to the grid. [...] The questionnaires for the farmers included questions that would help gain insight on the application process for the scheme, their irrigation habits before and after the addition of solar pumps, and to understand factors preventing farmers from availing themselves of the scheme. [...] The number of applications in the first cycle in the year 2020 far exceeded the 3,000 target, resulting in a backlog in terms of installation of systems. [...] Farmers also have the option of seeking assistance with regards to maintenance of the system, as five years of free of cost operations and maintenance by the developers are guaranteed under the PM-KUSUM scheme. [...] The reason for this is the numerous steps involved in getting new panels in the event of damage or theft The farmers have to place a call on a toll-free number of the vendor and wait for their turn to get a call back from the vendors.
Pages
52
Published in
India

Table of Contents