cover image: 00b — Part 00 — Page 1-3 — @Liberty — Issue 39 (21.06.2018).indd

20.500.12592/3nn96n

00b — Part 00 — Page 1-3 — @Liberty — Issue 39 (21.06.2018).indd

00b — Part 00 — Page 1-3 — @Liberty — Issue 39 (21.06.2018).indd ANTHEA JEFFERY @LIBERTY The policy bulletin of the IRR No 4/2018 I June 2018 I Issue 39 THE 2018 DRAFT MINING CHARTER: TRANSFORMATION TRUMPS SUSTAINABILTY Published by the South African Institute of Race Relations (IRR) 2 Clamart Road, Richmond Johannesburg, 2092 South Africa P O Box 291722, Melville, Johannesburg, 2109 South Africa. [...] Otherwise no part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronical, mechanical, photocopy, recording, or otherwise, without the prior permission of the publisher. [...] While the IRR makes all reasonable efforts to publish accurate information and bona fi de expression of opinion, it does not give any warranties as to the accuracy and completeness of the information provided. [...] The use of such information by any party shall be entirely at such party’s own risk and the IRR accepts no liability arising out of such use. [...] June 2018 @Liberty, the IRR’s policy bulletin No 4/2018 / June 2018 / Issue 39 THE 2018 DRAFT MINING CHARTER: TRANSFORMATION TRUMPS SUSTAINABILITY 3 TABLE OF CONTENTS THE 2018 DRAFT MINING CHARTER: TRANSFORMATION TRUMPS SUSTAINABILITY.
Pages
16
Published in
Johannesburg, South Africa