cover image: Managing safe and reliable operation of St Marys substation

Managing safe and reliable operation of St Marys substation

23 Jul 2024

Managing safe and reliable operation of St Marys substation Version Date Author initials • • • • Option Description of works Capital expenditure ($2023/24) Option 1 $7.0 Option 3 • • Variable / Scenario Central Low risk cost scenario High risk cost scenario Scenario weighting Discount rate Network capital costs Operating and maintenance costs Environmental, safety and financial risk benefit • • •. [...] • • • • • 2 NER 5.16.4(z1) refers to the preferred option being less than $35 million, or as varied in accordance with a cost threshold determination. [...] 𝑛 𝑇𝑄𝑅 = ∑(𝑃𝑜𝐹 × 𝑁𝑜) × (𝐿𝑜𝐶 × 𝐶𝑜𝐶) 𝑛=0 • • • • • • • • 5 See: Industry%20practice%20application%20note%20Asset%20replacement%20planning%20-%2025%20January%202019.pdf. [...] • • • • 12 Inter-Regional Planning Committee. [...] • • • • • • • 17 Australian Energy Regulator, Regulatory investment test for transmission Application guidelines, October 2023, Melbourne: Australian Energy Regulator.
y@2s%4#5

Authors

Dylan Frangos

Pages
42
Published in
Australia

Table of Contents