cover image: Energy Fiji LTD

Premium 20.500.12592/1emezmq

Energy Fiji LTD

2024

1.1.4 COST OF BIDDING The bidder shall bear all costs associated with the preparation and submission of its bid and the Employer will in no case be responsible or liable for those costs. 1.1.5 SITE VISIT Site Visit is not required. [...] Supply of 10 x 3.5MVA, 11/0.415kV, YNd11, 3Phase transformers 4 | P a g e 1.1.6 Tender Submission Bidders are requested to upload electronic copies via Tender Link by registering their interest at: EFL will not accept any hard copy submission to be dropped in the tender box at EFL Head Office in Suva. [...] Any other materials required to be completed and submitted by bidders in accordance with these Instructions to Bidders.Supply of 10 x 3.5MVA, 11/0.415kV, YNd11, 3Phase transformers 6 | P a g e 1.3.2 BID PRICE 1.3.2.1 1.3.2.2 1.3.2.3 Unless specified otherwise in Employer's Requirements, Bidders shall quote for the entire facilities on a “single re [...] Supply of 10 x 3.5MVA, 11/0.415kV, YNd11, 3Phase transformers 7 | P a g e 2 GENERAL CONDITIONS OF CONTRACT 2.1 STANDARDS The Goods supplied under this Contract shall conform to international ISO / DIN standards for mechanical and IEC / ISO and HD standards for electrical work. [...] Nothing in this clause shall in any way release the Contractor from any warranty or other obligations under this Contract in delivering a fully functional plant as specified elsewhere in this document or the contractors’ design and specifications.Supply of 10 x 3.5MVA, 11/0.415kV, YNd11, 3Phase transformers 8 | P a g e 2.5 INSURANCE The contractor shall provide for 100% insurance cove [...] Supply of 10 x 3.5MVA, 11/0.415kV, YNd11, 3Phase transformers 9 | P a g e 2.9 EXPLANATIONS If the Tender needs any clarifications, the inquiry should be made in writing to: Mr. [...] Such person to be an arbitrator will be nominated by the Fiji Institute of Engineers.Supply of 10 x 3.5MVA, 11/0.415kV, YNd11, 3Phase transformers 10 | P a g e 2.11 WARRANTY 2.11.1 The Contractor warrants that all Goods supplied under this Contract shall have no defect arising from material used workmanship or from any act or omission of the Contractor, that may develop under normal u [...] Illustrations and printed matter showing constructional details and details of instrumentation, protection and accessories.Supply of 10 x 3.5MVA, 11/0.415kV, YNd11, 3Phase transformers 12 | P a g e 3.1.3.2 The following drawings are to be submitted with the contract, in printed and electronic/AutoCAD formats: (i) Certified general arrangement drawings showing all fittings an [...] In case of conflict, the order of precedence shall be this specification below: AS standards IEC standards ISO standards Other standardsSupply of 10 x 3.5MVA, 11/0.415kV, YNd11, 3Phase transformers 13 | P a g e Type tests results are to be submitted in the Tender Bids. 3.1.5 TOOLS AND INSTRUMENTS The Contractor shall supply all special tools and instruments which m [...] All transformers are to be fully routine tested in accordance with the latest edition of AS2374 and each unit is supplied with a test certificate.
Pages
23
Published in
Fiji