Table of Contents
- The World Bank 1
- The World Bank 2
- BASIC INFORMATION 2
- A. Basic Project Data 2
- Proposed Development Objectives 2
- PROJECT FINANCING DATA US Millions 2
- Maximizing Finance for Development 2
- Is this an MFD-Enabling Project MFD-EP 2
- Is this project Private Capital Enabling PCE 2
- SUMMARY 2
- Total Operation Cost 500.00 2
- Total Financing 500.00 2
- Financing Gap 0.00 2
- DETAILS 2
- World Bank Group Financing 2
- The World Bank 3
- B. Introduction and Context With a gross domestic product GDP of US641 billion in 2023 Argentina is the third-largest economy in Latin 3
- America. The middle class has historically been large with social indicators generally above the regional average. 3
- The World Bank 4
- On June 2024 the International Monetary Fund IMF Executive Board approved the eighth review of the 4
- Extended Fund Facilities EFF enabling the disbursement of around US800 million. Argentinas power sector has been open to private investment and competition since 1992 and is structured 4
- The World Bank 5
- Energy subsidies represented roughly 1.5 percent of GDP in Argentina in 2023 a drop from the 2.0 and 2.3 5
- Compañía Administradora del Mercado Mayorista Eléctrico Sociedad Anónima 5
- Compañía 5
- Energy subsidies in the last two decades have been deeply marked by the 2001 crisis 5
- . A new attempt to rationalize subsidies and set cost-reflective tariffs was made in early 2016. 5
- The World Bank 6
- In mid-2022 the government started revising tariff structures to better target subsidies to poor and vulnerable 6
- Registro de Acceso a los Subsidios a la Energía Registro 6
- The World Bank 7
- Argentinas success in implementing reforms hinges on understanding the effects of current subsidies on 7
- Strengthening Policies Institutions and Investments for Rebuilding Better. 7
- The World Bank 8
- C. Proposed Development Objectives 8
- D. Concept Description The Project would consist of three components 8
- Component 1 Enabling conditions to improve subsidies targeting 8
- Improving subsidies targeting and data will require developing or improving up-to-date and consolidated 8
- Component 2 Developing capacities and instruments to foster sector sustainability and efficiency 8
- The World Bank 9
- Further revising subsidy schemes will require evaluating the distributive impact of tariff increases on 9
- Triggered 9
- Last approved Current 9
- The World Bank 10
- CONTACT POINT 10
- World Bank 10
- BorrowerClientRecipient 10
- Argentine Republic 10
- Implementing Agencies 10
- Secretary of Energy 10
- FOR MORE INFORMATION CONTACT 10
- The World Bank 11
- APPROVAL 11
- Approved By 11