- Environmental and Social Management Plan (ESMP) Yemen Emergency Human Capital Project (P176570)
- Lending Instrument
- Investment Project Financing
- Pages
- 123
- Product Line
- IBRD/IDA
- Published in
- United States of America
- Rel Proj ID
- RY-Yemen Emergency Human Capital Project -- P176570
- TF No/Name
- TF0C0061-GFF Yemen TA Activities (Roll-over of funds from TF0B5390)
- Unit Owning
- Health Nutrition &Population MNA (HMNHN)
- Version Type
- Final
Files
Table of Contents
- Supply and Installation of Solar Power System into Water Pumping Station in 1
- Shibam Kawkaban City in Al Mahweet Governorate 1
- Supply and Installation of Solar Units into al Mahela Area Al Hamdi Park Wells 1
- Dhamar City 1
- Sub-Project EHC-PR-WS-DHAM-002 1
- Table of Contents 2
- Abbreviations 4
- Chapter 1 Introduction 6
- Chapter 2. Sub-Project Description 7
- 2.1 Description 7
- Civil Works 9
- 2.2 Location 11
- Dhamar City 12
- Chapter 3. Environmental and Social Baseline 15
- Al-Mahweet governorate 15
- CLIMATE METEOROLOGICAL CONDITIONS 15
- Average Temperature in Shibam 15
- Clouds 16
- Precipitation 17
- Rainfall 18
- Sun 19
- Humidity 21
- Topography 21
- Solar Energy 22
- Dhamar governorate 23
- Chapter 4. Environmental and Social Risks and Impacts 25
- 4.1 Applicability 25
- 4.2 Eligibility Exclusion List 25
- Statement Yes No 25
- 4.3 Environmental and Social Screening 26
- 4.4 Environmental and Social Impacts 28
- Environmental Risk and Impacts 28
- Social Risk and Impacts 28
- OHS Risk and Impacts 28
- Operational and maintenance phase 30
- Groundwater Monitoring 30
- Pumping Regulations 30
- Chapter 5. Consultations 31
- 5-1 Consultation topics 31
- 5-2 Gender and related issues 32
- 5-3 Child Labor 32
- 5-4 Recruitment of workers 32
- 5-5 Gender Based Violence- SEASH 32
- 5-6 Subproject sustainability 32
- 5-7 Consultation during implementation 33
- 5-8 Photos of Public Consultation 34
- 5-9 Grievance Mechanism GM 36
- 5-10 GM Procedures for Complaints 36
- Registering Complaints 36
- Summary of Complaints Management Review Process 38
- Time frame Responsibility Action 38
- Chapter 6. Mitigation measures 40
- Environmental and Social Mitigation Plan 40
- Labor Management 40
- The mitigation measures shall include 40
- Chapter 7. Monitoring Plan 58
- Annex 1 GM Complaint and Suggestion Form 70
- Annex 2 List of Stakeholder Consulted available upon request 71
- Annex 3 List of Stakeholder Consulted available upon request 72
- Annex 3 Technical specification 73
- Electrical Works 73
- Solar Pumping Inverter Controller 74
- PV Combiner Box 74
- System Cables 75
- Cable Laying 75
- Earthing and Lightning Systems 76
- AC and DC Earthing 76
- Lightning System 76
- Moulded Case Circuit Breaker MCCB 76
- PART B Safety and Security 76
- Solar Outdoor Lighting 76
- Fire Extinguishers 77
- Smoke and Heat Detector 77
- PART C Mechanical 77
- Submersible Pump and Motor 77
- Surface Pump and Motor 77
- Motor 77
- Piping Equipment Martial 78
- Horizontal Pumping line Non-return Valve. 78
- Gate Valve 78
- Pressure Switch 78
- Analogue Pressure Gauge. 79
- Well Cap Cover 79
- 2.3 Scope of Work 80
- BOQ - Equiping Solar PV System for Shibam Kawkaban Pumping Station 80
- Aljadeed Well Dhamar -Yemen 96
- Item Unit QTY Unit Price USD 97
- Total Price USD 97
- PV MODULES. 97
- Pcs 96 0 97
- PV Combiner boxes 98
- Pcs 1 0 98
- Nots 98
- Pcs 1 0 98
- AC circuit breaker 98
- DC and AC Cabling Wiring Pipestrenches 99
- Nots Nots 0 99
- DC Cable from array to Combiner Box 99
- DC Cable from Combiner Box to inverters 99
- AC cable form Generator supply to inverters 100
- Grounding Lightning System DC Grounding AC grounding 100
- 4 0 100
- Solar Street Lighting Systems 100
- Pcs 4 0 100
- 8 Fire alarm System 100
- Note 100
- Smoke and Heat Detectors Supply install test and commission of standalone smoke and 100
- Pcs 2 0 100
- Flame Detectors Supply install test and commission of Flame Detector including all required fire resistant cable Technical Specifications 101
- Pcs 2 0 101
- Note 101
- Fire Extinguisher Carbon Dioxide 101
- Pcs 1 0 101
- Fire Extinguisher Powder extinguisher 101
- Pcs 2 0 101
- Project Sign board 101
- Pcs 1 0 101
- LS 1 0 101
- Total US 0 101
- B CIVIL WORKS 101
- Steel Mounting Structure 102
- Site Grading and Leveling 102
- GROUND LEVEL MOUNTING STRUCTURES 103
- TOTAL PRICE Lot-1 103
- Al Mahlah Well Dhamar -Yemen 104
- Well Alnaser Dhamar -Yemen 115