Authors
Organizations mentioned
- Disclosure Date
- 2024/08/25
- Disclosure Status
- Disclosed
- Doc Name
- Environmental and Social Management Plan (ESMP) Emergency Food Security and Resilience Support Project (P178926)
- Lending Instrument
- Investment Project Financing
- Pages
- 342
- Product Line
- IBRD/IDA
- Published in
- United States of America
- Rel Proj ID
- EG-Emergency Food Security And Resilience Support Project -- P178926
- TF No/Name
- TF0C2552-Improved Policy Options for Egyptâs Food Subsidy Programs
- Unit Owning
- Agriculture and Food PG MNA (SMNAG)
- Version Type
- Final
Table of Contents
- Emergency Food Security and Resilience Support Project P178926 1
- Prepared by EHCSS 1
- August 2024 1
- Date Authors Reviewed by Approved by 2
- August 2
- 2024 2
- Dr. Magdy Alwany Dr. Ayman Abdel-Hamid Dr. Mohamed Salem Dr. Rafat Afifi Dr. Islam Nagi Ms. Yasmeen Ismail 2
- Dr. Ashraf Sadek Eng. Sameh Helal 2
- Table of Contents 3
- LIST OF ABBREVIATIONS 5
- Abbreviation Definition 5
- EXCUTIVE SUMMARY 6
- INTRODUCTION 16
- PROJECT DESCRIPTION 21
- 3.1.1 Egyptian Environmental Institutional Framework 35
- 3.1.2 Egyptian Environmental and Social Regulatory Context 35
- POLICY LEGAL AND ADMINSTRATIVE FRAMEWORK 35
- 3.1.3 International Legislations 48
- 4.1. Physical Environment 53
- 4.1.1 Weather and Climate 53
- 4.1.2 Air Quality 53
- BASELINE EXISTING ENVIRONMENTAL CONDITIONS 53
- 4.1.3 Noise Level 54
- 4.1.4 Geology 55
- 4.1.5 Hydrology 56
- 4.1.6 Seismicity of the Assiut area 58
- 4.1.7 Flash floods of Assiut Governorate 59
- 4.1.8 Wind Speed and Direction 60
- 4.2. Biological Environment 61
- 4.2.1 61
- 4.3. Socio-Economic Aspects 62
- 4.3.1 Basic Demographic Characteristics 62
- 4.3.2 Living Conditions 67
- 4.3.3 Labour Profile 68
- 4.3.4 Economic Activities and Well Being 68
- 4.3.5 Social Services Profiles 69
- 4.3.6 Infrastructure 70
- 4.3.7 Investment and Development 71
- 4.3.8 Archaeology and Cultural Heritage 71
- 4.3.9 Status of Women 72
- 4.3.10 Land Use 72
- IDENTIFICATION AND ANALYSIS OF ENVIRONMENTAL AND SOCIAL RISKS AND IMPACTS 73
- ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN 127
- STAKEHOLDERS CONSULTAIONS AND PUBLIC PARTICIPATION 252
- 8.1. Summary and Conclusions 268
- SUMMARY AND CONCLUSIONS 268
- REFERENCES 269
- 1. Background 272
- 2. Advantages and Disadvantages of Storage Silos 272
- 3. Pest Management Targeted Silos 272
- Appendix I Pest Management Plan PMP 272
- 4. Regulatory framework for implementing the PMP 273
- 5. Pesticides management in EHCSS silos 277
- 6. Risks and Impacts of Pest Management 282
- 7. Mitigation and Monitoring Measures 282
- PPE Required for Working with Phostoxin 285
- 8. Capacity Building and Training on Pesticide Use and Handling 287
- 9. Implementation of PMP 290
- 1. Background 291
- Appendix II Traffic Management Plan TMP 291
- 2. Assuit Silo 293
- 3. Traffic Management Requirements 296
- 3.1. Records 296
- 3.2. Managing Traffic Risks 296
- 3.3. Identifying Traffic Hazards 296
- 3.4. Assessing Traffic Risks 297
- 3.5. Risk Control Measures for Traffic Management 297
- 3.5.1. Information training instruction and supervision 299
- 3.5.2. Keeping people and Trucks apart 299
- 3.5.3. Trucks Routes 300
- 3.5.4. Pedestrian Crossings 300
- 3.5.5. Parking Areas 300
- 3.5.6. Reversing Trucks 301
- 3.5.7. Loading and Unloading Trucks 301
- 3.5.8. Signs and road markings 301
- 3.5.9. Lighting 301
- 3.6. Safe Work Method Statements for Traffic Management 302
- 3.6.1. Induction Processes 303
- 3.6.2. Safety Equipment 303
- 4. Implementation of the Plan 304
- 4.1. Site Supervisor 304
- 4.2. Traffic Control Plan TCP 305
- 4.3. Traffic Control Supervisor 305
- 1. Background 307
- 2. OHSMP for Silos project include the following 307
- Appendix III Occupational Health and Safety Management Plan OHSMP 307
- 3. Legal Framework 308
- World Bank Environmental and Social Standards 308
- 4. OHSMP Requirement 308
- 5. Monitoring Plan of Occupational Health and Safety Risks 316
- 7. Implementation of OHSMP 320
- Appendix IV Sexual Exploitation Abuse and Sexual Harassment Plan 323
- Appendix V Assuit Subproject Documents and Figures 328
- Appendix VI Emergency Evacuation Plan 337
- Appendix VII Grievance Log Form 340