Volume 5 of the Phase 2 report is in two parts: Part 7 - Replacement of the gas riser
Part 8 - The London Fire Brigade. The UK Prime Minister announced on 15 June 2017 a public Inquiry into the fire at Grenfell Tower on the night of 14 June 2017. The Grenfell Tower Inquiry examined the circumstances leading up to and surrounding the fire. The Inquiry investigated a List of Issues in two phases. Phase 1, published in 2018, focused on the factual narrative of the events on the night of 14 June 2017. Phase 2 of the Inquiry examines the causes of these events, including how Grenfell Tower came to be in a condition which allowed the fire to spread in the way identified by Phase 1.
Authors
- Pages
- 212
- Published in
- United Kingdom
Table of Contents
- Part 7: Replacement of the gas riser 5
- Chapter 68: Replacement of the gas riser 7
- Part 8: The London Fire Brigade 19
- Chapter 69: Introduction to Part 8 21
- Chapter 70: Organisation 23
- Chapter 71: Training 31
- Chapter 72: Incident command training 39
- Chapter 73: Modern materials and methods of construction 47
- Chapter 74: The response to the Lakanal House fire 51
- Chapter 75: Existing sources of information 67
- Chapter 76: Operational planning 81
- Chapter 77: High-rise firefighting: policy and guidance 93
- Chapter 78: The control room 101
- Chapter 79: Fire survival guidance: training and management 133
- Chapter 80: Communications 173
- Chapter 81: The supply of water 191
- Chapter 82: Aspects of firefighting at Grenfell Tower 201
- Chapter 83: Conclusions 207