Authors
- Disclosure Date
- 2024/09/11
- Disclosure Status
- Disclosed
- Doc Name
- Environmental and Social Impact Assessment Eastern Türkiye Middle Corridor Railway Development Project (P179128)
- Pages
- 117
- Published in
- United States of America
- Rel Proj ID
- TR-Eastern Türkiye Middle Corridor Railway Development Project -- P179128
- Unit Owning
- Infra ECA Transport (IECTR)
- Version Type
- Final
Table of Contents
- 4.3.2 Baseline Conditions 1
- 4.3.2.1 Air Quality 1
- 4.3.2.2 Greenhouse Gases 6
- 4.3.3 Impact Assessment 10
- 4.3.3.1 Land Preparation and Construction Phase 10
- Air Quality Modeling 13
- First stage 13
- Second stage 13
- Third stage 13
- Stage four 13
- 4.3.3.2 Operation Phase 14
- 4.3.4 Potential Impact Significances and Mitigation Measures 15
- 4.4 Water Resources Water Quality and Wastewater Management 17
- 4.4.1 Project Standards and Methodology 17
- 4.4.1.1 Methodology 17
- 4.4.1.2 Project Standards 17
- 4.4.2 Baseline Conditions 19
- 4.4.2.1 Surface Water Resources 19
- Euphrates Sub-Basin 19
- Aras Basin 20
- Euphrates River 21
- Kars Stream 22
- Karasu Stream 22
- Çaltı Stream 22
- 4.4.2.2 Surface Water Quality 22
- 4.4.3 Impact Assessment 26
- 4.4.3.1 Land Preparation and Construction Phase 26
- Water Use 26
- Wastewater Generation 26
- Impacts on Surface Water Flow 27
- Impacts on Groundwater 27
- 4.4.3.2 Operation Phase 28
- Water Use and Wastewater Generation 28
- Impacts on Surface Water and Groundwater 28
- 4.4.4 Potential Impact Significances and Mitigation Measures 29
- 4.5 Resource and Waste Management 31
- 4.5.1 Project Standards and Methodology 31
- 4.5.1.1 Methodology 31
- 4.5.1.2 Project Standards 32
- 4.5.2 Baseline Conditions 33
- 4.5.2.1 Material Requirements 33
- PREVENTION MINIMIZATION 33
- REUSE AND PREPERATION FOR 33
- RE-USE 33
- RECYCLING 33
- RECOVERY 33
- Most 33
- Least 33
- 4.5.2.2 Waste Generation Rates and Waste Management Infrastructure in the Region 38
- 4.5.3 Impact Assessment 39
- 4.5.3.1 Land Preparation and Construction Phase 39
- Excavation and Construction Wastes 40
- Non-hazardous Solid Waste 40
- Hazardous and Special Wastes 42
- 4.5.3.2 Operation Phase 42
- Non-hazardous Solid Wastes 43
- Wastes from Maintenance and Repair Operations 43
- Ballast Cleaning 43
- Superstructure RenovationRenewal 43
- Infrastructure RenovationRenewal 44
- Hazardous and Special Wastes 44
- 4.5.4 Potential Impact Significances and Mitigation Measures 44
- 4.5.4.1 Waste Generation 44
- 4.5.4.2 Material Use 45
- 4.6 Cultural Heritage 51
- 4.6.1 Project Standards and Methodology 51
- 4.6.1.1 Methodology for Baseline Studies 52
- Desk Study 52
- Field Surveys 52
- 4.6.1.2 Methodology for Impact Assessment 53
- 4.6.2 Baseline Conditions 56
- 4.6.2.1 Archaeological and Historical Background based on Desktop Review 57
- 4.6.2.2 Tangible Cultural Heritage Based on Field Surveys 62
- 4.6.2.3 Intangible Cultural Heritage Based on Desktop Studies 64
- 4.6.2.4 Critical Cultural Heritage 72
- 4.6.2.4.1 Internationally Recognized Cultural Heritage Sites 72
- 4.6.2.4.2 Legally Protected Registered Cultural Heritage 75
- 4.6.2.4.3 Archaeological Potential 75
- 4.6.3 Impact Assessment Significance and Mitigation Measures 75
- Tangible Cultural Heritage 75
- Intangible Cultural Heritage 78
- 4.7 Project Standards and Methodology 88
- 4.7.1 Project Standards 88
- The World Bank Environmental and Social Standards - ESS6 92
- 4.7.2 Methodology for Biodiversity Studies 94
- 4.7.3 Biodiversity Study Area 94
- 4.7.4 Protected Areas 95
- 4.7.4.1 Legally Protected Areas 95
- LC VU VU EN LC LC 104
- VU VU VU LC LC LC EN 104
- 4.7.4.2 Internationally Recognized Areas of High Biodiversity Value 104
- Divriği Hills Important Nature Area 113
- EN VU CR EN EN EN CR VU LC 113
- Munzur Moutains Important Nature Area and Important Plant Area 113
- Esence Keşiş Mountains Important Nature Area 113
- Kop Mountains Important Plant Area 114
- CR EN 114
- VU LC DD 114
- Sarıkamış Forests Important Nature Area 114
- Çıldır Lake Important Nature Area and Important Plant Area 114
- EN NT LC LC LC LC LC 115
- 4.8 Baseline Conditions 115
- 4.8.1 Habitat Classification 115