cover image: TOPOLOGY OPTIMIZATION CASE STUDIES TABLE OF CONTENTS

20.500.12592/15bq7nh

TOPOLOGY OPTIMIZATION CASE STUDIES TABLE OF CONTENTS

24 Jun 2024

MISO, in support of a group of stakeholders, created a formal process to verify and approve economic reconfiguration requests from MISO members to ensure that the requests are assessed in a consistent, reliable, and timely manner across the MISO 1 Pablo Ruiz and Mitchell Myhre, Congestion Mitigation with Transmission Reconfigurations, Organization of MISO States Market and Transmission Work Groups. [...] The Brattle Group’s analysis of applying a combination of topology optimization, dynamic line ratings and power flow control devices to the Kansas and Oklahoma portion of the SPP grid demonstrates that the combination of these technologies could reduce congestion and more than double the existing headroom for interconnecting renewable resources, adding 3.7 GW of headroom with a payback period of o. [...] In 2018, NewGrid, SPP and The Brattle Group evaluated the potential of using topology optimization to identify reconfigurations to support decision making in Operations Planning. [...] The resulting congestion cost savings in the real-time markets were estimated to be in the range of $18-44 million annually. [...] The cost of electricity to customers in the area increased by over $15 million in the first 10 weeks of 2014 due to congestion.

Authors

Kristin Collins

Pages
9
Published in
United States of America

Table of Contents