Authors
- Disclosure Date
- 2024/09/29
- Disclosure Status
- Disclosed
- Doc Name
- Ukraine - EUROPE AND CENTRAL ASIA- P132386- Second Urban Infrastructure Project - Procurement Plan
- Lending Instrument
- Investment Project Financing
- Originating Unit
- Water Europe and Central Asia (SCAWA)
- Pages
- 12
- Product Line
- IBRD/IDA
- Published in
- United States of America
- Rel Proj ID
- UA-Second Urban Infrastructure Project -- P132386
- TF No/Name
- TF017112-Second Urban Infrastructure Project (UIP2) - CTF Loan TF,TF017382-PREPARATION OF UKRAINE: URBAN INFRASTRUCTURE PROJECT â 2 (UIP2),TF0A4662-Ukraine - Second Urban Infrastructure Project - MDB Fees,TF0C0039-Integrating resilience for âbuilding back betterâ the water s
- Unit Owning
- Water Europe and Central Asia (SCAWA)
- Version Type
- Final
Table of Contents
- Ukraine APPROVE D 1
- Urban Infrastructure Project - 2 LA 8391-UA and TF017112 1
- Minregion UIP-2 Coordinat or 1
- E.B. Kruglyak 1
- 4. Period covered by this procurement plan November 21 2014 - October 31 2020 1
- 5. Procureme nt Thresholds Expenditur e Category 2
- Contra ct Value USD 2
- Procu reme nt Meth od 2
- Bank Prior Review 2
- 5 000 000 2
- ICB All the ICB contracts 2
- 5 000 000 2
- NCB Post review 2
- 200 000 2
- Shopp ing 2
- Post review 2
- Small Works SW Works W Design Supply and Installation DSI Supply and Installation SI contracts 2
- NA DC All DC contracts 5 000 000 2
- 1 500 000 2
- ICB All the ICB contracts 2
- 1 000 000 2
- NCB Post review 2
- 100 000 2
- Shopp ing 2
- Post review 2
- Goods G Information Technology IT non- consulting services S 2
- NA DC All DC contracts 1 500 000 2
- 300 000 2
- QCBS QBSF BSLC S 2
- 300 000 2
- QCBS QBSF BSLC S and CQS 2
- NA SSS 2
- Consultant Services CS 2
- NA IC 2
- All contracts 500 000 for firms all contracts 200 000 for individuals and all SSS contracts 500 000 for firms all SSS contracts 200 000 for individuals Draft TORs 2