cover image: MERRYWEATHER PLACE – GREENWICH SE10 _ OV _ ERVIEW

MERRYWEATHER PLACE – GREENWICH SE10 _ OV _ ERVIEW

24 Mar 2016

across London and This series of building profiles gives The development was subject to the requirements southern England examples of manufacturers, developers of Approved Document L 2006, the London Plan COMPLETED and clients who have embraced the and Code for Sustainable Homes Level 3. [...] 2012 challenge and are developing practical, As a result the development was required to achieve commercially viable ways of delivering a 25% reduction in carbon emissions over the the next generation of homes in requirements of AD L 2006 and offset 10% of annual preparation for the nationwide carbon emissions from renewable technology. [...] BUILDING PROFILE MERRYWEATHER PLACE – GREENWICH SE10 _PR_OJECT STRATEGY KEY PLANNING CHALLENGES Merryweather place was subject to the requirements Carbon dioxide use on site was offset by the use of of the London Plan 2011, which; at the time, required the communal biomass boiler; it was calculated that in a reduction in carbon emissions over the Approved order to do this it needed to provide appr. [...] DESIGN AND CONSTRUCTION Due to the higher level of noise pollution on the side Due to a low static pressures requirement across the of the site located next to the Dockland Light Railway blocks all heat interface units could be domestic hot (DLR) network, a number of dwellings within the water (DHW) single plate type, allowing the heating development were designed with integrated whole runs into t. [...] Although the development falls short of the Fabric Energy Efficiency Standard of 39 kWh/M2/year proposed by the ZCH, the site was not subject to the performance standards of current regulations.
Pages
4
Published in
United Kingdom