Authors
- Disclosure Date
- 2024/11/04
- Disclosure Status
- Disclosed
- Doc Name
- Disclosable Version of the ISR - Multi-Sectoral Crisis Recovery Project for North Eastern Nigeria - P157891 - Sequence No : 14
- Lending Instrument
- Investment Project Financing
- Pages
- 8
- Product Line
- IBRD/IDA
- Published in
- United States of America
- Rel Proj ID
- NG-Multi-Sectoral Crisis Recovery Project For North Eastern Nigeri -- P157891
- TF No/Name
- TF0A7631-Development and Operationalization of a Recovery Aid Tracking, Monitori,TF0B9912-Building Urban Climate and Disaster Resilience in Nigeria
- Unit Owning
- Urban DRM AFR West and Central 4 (IAWU4)
- Version Type
- Final
Table of Contents
- The World Bank 1
- 1. OBJECTIVE 1
- 1.1 Development Objective 1
- 2. COMPONENTS 1
- 3. OVERALL RATINGS 1
- The World Bank 2
- 4. KEY ISSUES STATUS 2
- 4.1 Implementation Status and Key Decisions 2
- The implementation status of the three project components is summarized below 2
- Component 1 Peacebuilding and Strengthening Social Cohesion and Livelihoods US75 million equivalent. 2
- Component 2 Infrastructure Rehabilitation and Service Delivery Restoration and Improvement US256 million equivalent. 2
- The World Bank 3
- Component 3 Technical Assistance and Program Management Support US45 million equivalent. 3
- 5. SYSTEMATIC OPERATIONS RISK-RATING TOOL 3
- The World Bank 4
- The World Bank 5
- 6. RESULTS 5
- 6.1 PDO Indicators by PDO Outcomes 5
- 6.2 Intermediate Results Indicators by Components 5
- The World Bank 6
- Not Categorized 6
- The World Bank 7
- 7. DATA ON FINANCIAL PERFORMANCE 7
- 7.1 Cumulative Disbursements 7
- 7.2 Disbursements by loan 7
- 7.3 Key Dates by loan 7
- The World Bank 8
- 8. KEY DATES 8
- 9. RESTRUCTURING HISTORY 8
- 10. ASSOCIATED OPERATIONS 8