Authors
- Disclosure Date
- 2024/11/14
- Disclosure Status
- Disclosed
- Doc Name
- Indonesia - EAST ASIA AND PACIFIC- P157585- Strategic Irrigation Modernization and Urgent Rehabilitation Project - Procurement Plan
- Lending Instrument
- Investment Project Financing
- Originating Unit
- Water East Asia & Pacific Region (SEAW1)
- Pages
- 12
- Product Line
- IBRD/IDA
- Published in
- United States of America
- Rel Proj ID
- ID-Strategic Irrigation Modernization And Urgent Rehabilitation Pr -- P157585
- TF No/Name
- TF0A7558-Modernizing Irrigation Service Delivery and Participatory Management,TF0B1520-Modernizing Irrigation Service Delivery of Indonesia National Irrigatio,TF0B7104-INDONESIA WATER SECURITY POLICY DIALOGUE,TF0B9565-Contractualized Irrigation Management,TF0C1730-Irrigation Performance Assessment through Remote Sensing,TF0C2114-Indonesia : Engagement of private sector for irrigation Operation and M,TF0C3714-Preliminary Assessment of Batanghari River Basin,TF0C3885-Assessment on Water Resources Endowment Fund,TF0C5911-IMPROVING THE PERFORMANCE OF THE WATER SECTOR IN INDONESIA
- Unit Owning
- Water East Asia & Pacific Region (SEAW1)
- Version Type
- Final
Table of Contents
- STRATEGIC IRRIGATION MODERNIZATION AND URGENT REHABILITATION PROJECT 1
- SIMURP 1
- I. General Information 1
- 1. Project information 1
- 2. Banks No Objection Date of the Procurement Plan 1
- 3. Date of General Procurement Notice 1
- 4. Period covered by this procurement plan 2
- II. Types of Contract Banks Review Requirements and Applied Methods 2
- Works Goods and Non-Consulting Services 2
- 1. Prior Review Threshold 2
- Ref. No. Procurement Method Procureme nt Method Threshold 2
- Banks Review Requirement 2
- 1. Pre-qualification 3
- 2. Proposed Procedures for CDD Components as per paragraph. 3.17 of the Guidelines 3
- 3. Reference to if any Project OperationalProcurement Manual 3
- 4. Any Other Special Procurement Arrangements 3
- 5. Summary of the Procurement Packages 3
- 1 2 3 4 5 3
- Ref. No. 3
- Description Review by Bank 3
- Estimate d 3
- Cost US mil. 3
- Number of Package s 3
- ICB 3
- B. NCB 3
- C. Shopping 3
- D. Direct Contracting 3
- Total All methods and Review Requirements 4
- 25085 44 4
- Selection of Consultants 4
- 1. Prior Review Threshold 4
- Ref. No. 4
- Selection Method 4
- Selection Method Threshold 4
- Banks Prior Review Requirement 4
- Ref. No. 5
- Selection Method 5
- Selection Method Threshold 5
- Banks Prior Review Requirement 5
- 2. Short list comprising entirely of national consultants 5
- 3. Any Other Special Selection Arrangements 5
- 4. Summary of Consultancy Assignments 5
- 1 2 3 4 5 5
- Ref. No. 5
- Description Review by Bank 5
- Estimate d 5
- Cost US mil. 5
- Number of Package s 5
- A. Consulting Firm 5
- Sub-total All methods and Review Requirements 6
- 65.52 12 6
- B. Individual Consultant 6
- Sub-total All methods and Review Requirements 6
- 1.27 17 6