Authors
- Disclosure Date
- 2024/11/13
- Disclosure Status
- Disclosed
- Doc Name
- Liberia - WESTERN AND CENTRAL AFRICA- P169718- Liberia Urban Resilience Project - Procurement Plan
- Lending Instrument
- Investment Project Financing
- Pages
- 12
- Product Line
- IBRD/IDA
- Published in
- United States of America
- Rel Proj ID
- LR-Liberia Urban Resilience Project -- P169718
- TF No/Name
- TF0B2111-Supporting Multi-risk Assessment of Greater Monrovia,TF0B8483-Liberia Urban Resilience Technical Assistance,TF0C5146-Liberia - Towards a Stronger DRM Policy Framework
- Unit Owning
- Urban DRM AFR West and Central 4 (IAWU4)
- Version Type
- Final
Table of Contents
- Project information Liberia Monrovia Integrated Development Project 1
- Project Implementation Agency Ministry of Public Works 1
- Date of the Procurement Plan September 2021 1
- Period covered by this Procurement Plan September 2021-December 2022 1
- Preamble 1
- The Banks Standard Procurement Documents 1
- Anti-Corruption Guidelines including without limitation the Banks right to sanction and the Banks inspection and audit rights. The form of the Letter of Acceptance is attached in Appendix 1. 2
- Leased Assets 2
- Procurement of Second Hand Goods 2
- Domestic preference Goods and Works 2
- Goods Not Applicable for those contracts identified in the Procurement Plan tables 2
- Works Not Applicable for those contracts identified in the Procurement Plan tables. 2
- Hands-on Expanded Implementation Support HEIS as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations Not Applicable. 2
- Other Relevant Procurement Information 2
- Pre-qualification Expected for the packages of worksgoods packages in the procurement plan. 3