- Disclosable Restructuring Paper - Senegal Cadastre and Land Tenure Improvement Project - P172422
- Lending Instrument
- Investment Project Financing
- Originating Unit
- Urban LN (SURLN)
- Pages
- 16
- Product Line
- IBRD/IDA
- Published in
- United States of America
- Rel Proj ID
- SN-Senegal Cadastre And Land Tenure Improvement Project -- P172422
- TF No/Name
- TF0B5732-Strengthening the Senegalese Spatial Data Infrastructure,TF0B7247-Senegal Land and Gender Phase 1 Analytics-2103460
- Unit Owning
- Urban DRM AFR West and Central 1 (IAWU1)
- Version Type
- Final
Table of Contents
- Report No RES00267 1
- RESTRUCTURING PAPER 1
- ON A 1
- PROPOSED PROJECT RESTRUCTURING 1
- Senegal Cadastre and Land Tenure Improvement Project 1
- APPROVED ON 15-Jun-2021 1
- Republic of Senegal 1
- Urban Resilience and Land Western And Central Africa 1
- The World Bank 2
- ABBREVIATIONS AND ACRONYMS 2
- The World Bank 3
- BASIC DATA 3
- Product Information 3
- Organizations 3
- OPERATION STATUS 3
- Project Development Objective DO 3
- Disbursement Summary in USD million 3
- The World Bank 4
- Policy Waivers 4
- The World Bank 5
- I. PROJECT STATUS AND RATIONALE FOR RESTRUCTURING 5
- II. DESCRIPTION OF PROPOSED CHANGES 5
- III. PROPOSED CHANGES 5
- IV. DETAILED CHANGES 5
- The World Bank 6
- I. PROJECT STATUS AND RATIONALE FOR RESTRUCTURING 6
- A. Project status 6
- Progress towards the Project Development Objective PDO has been downgraded from Satisfactory S to Moderately Satisfactory MS in the latest Implementation Status and Results Report ISR. 6
- The World Bank 7
- Implementation Progress IP remains Moderately Satisfactory MS. 7
- Component 1 strengthening land institutions and investing in geospatial infrastructure 34.03 million in the original design was upgraded from Moderately Satisfactory MS to Satisfactory S. 7
- Component 2 Empowering Project-supported municipalities in carrying out systematic land registration operations 29.15 million in the original design remains Moderately Satisfactory MS. 7
- Component 3 Sustaining long-term policy dialogue scaling-up training and innovation in the land sector 10.9 million in the original design remains Satisfactory S. 7
- Component 4 Program Coordination Monitoring and Knowledge Management 5.92 million in the original design was downgraded from Satisfactory S to Moderately Satisfactory MS 7
- The World Bank 8
- B. Rationale for restructuring 8
- The proposed restructuring aims to optimize the . 8
- The results framework remains unchanged but needs some minor adaptation. 8
- II. DESCRIPTION OF PROPOSED CHANGES 8
- C. Changes in budget allocation by component 8
- The Mid-Term Review MTR identified differences between the initially allocated amounts to each component and the actual implementation of activities. 8
- Reduction of budget allocated to Component 1. 8
- Reduction of the budget allocated to Component 3. 8
- Increase in the budget allocated to Component 2. 8
- The World Bank 9
- D. Changes in the results framework 9
- Addition of a new indicator Plots mapped with NICAD recorded in LIS with Project support. 9
- Replacement of the indicator Annual reports produced by the National Land Observatory by Annual reports produced by the Project on specific topics. 9
- The World Bank 10
- III. PROPOSED CHANGES 10
- Operation Information Proposed Changes Operation Information Proposed Changes 10
- The World Bank 11
- IV. DETAILED CHANGES 11
- COMPONENTS 11
- Current 11
- Component Name 11
- Current Cost USD Action Proposed 11
- Component Name 11
- Proposed Cost USD 11
- TOTAL 80000000.00 80000000.00 11
- COSTS FINANCING 11
- Private Capital Facilitation 11
- Is this an MFD-Enabling Project MFD-EP 11
- The World Bank 12
- Is this project Private Capital Enabling PCE 12
- LOANS 12
- ENVIRONMENTAL SOCIAL 12
- Environmental Social Assessment 12
- The World Bank 13
- The World Bank 14
- The World Bank 15
- The World Bank 16