Uttarakhand Integrated and Resilient Urban Development Project: Sewerage and Storm Water Drainage System Development in THDC area and Yamuna Colony of Kargi Zone (Package WW-DDN-01) Initial Environmental Examination

20.500.12592/mszpf3

Uttarakhand Integrated and Resilient Urban Development Project: Sewerage and Storm Water Drainage System Development in THDC area and Yamuna Colony of Kargi Zone (Package WW-DDN-01) Initial Environmental Examination

15 Sep 2021

Initial Environmental Examinations (IEE) describe the environmental condition of a project, including potential impact, formulation of mitigation measures, and preparation of institutional requirements for environmental monitoring. This document dated September 2021 is provided for the ADB project 38272-044 in India.
india water urban development
ProjectNumber
38272-044
Published in
Philippines

Related Topics

All