cover image: Disclosable Version of the ISR - Turkey Resilient Landscape Integration Project (TULIP) - P172562 - Sequence No : 01 (English)

20.500.12592/bd0mjd

Disclosable Version of the ISR - Turkey Resilient Landscape Integration Project (TULIP) - P172562 - Sequence No : 01 (English)

1 Oct 2021

Land is the terrestrial biologically productive system comprising soil, vegetation, and the associated ecological and hydrological processes; Adoption refers to Comments: change of practice or change in the use of a technology promoted or introduced by the project; Sustainable landscape management (SLM) practices refers to a combination of at least two technologies and approaches to increase land [...] IN01044327 ►National Strategy for Resilient Landscape Integration developed (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No -- No Yes Date 01-Jul-2021 -- 22-Sep-2021 30-Jun-2022 10/1/2021 Page 2 of 9 The World Bank Implementation Status & Results Report Turkey Resilient Landscape Integration Project (TULIP) (P172562) Comments: This indicator will measure the develo [...] IN01044335 ►Reduction of fuelwood use (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 30.00 Date 01-Jul-2021 -- 22-Sep-2021 26-May-2028 This indicator measures the decrease in the amount of fuelwood consumption by project beneficiaries to Comments: meet their heating and cooking needs. [...] IN01044350 Farmers reached with agricultural assets or services - Female (Number, Corporate Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 2,300.00 IN01044351 ►Number of female owned businesses or associations supported by the Project (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 150.00 Date 01-Jul-2021 -- 22-Sep- [...] IN01044352 ►Number of jobs created through green infrastructure and sustainable livelihood activities (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 4,000.00 Date 01-Jul-2021 -- 22-Sep-2021 26-May-2028 This indicator measures the number of direct and indirect jobs (full-time equivalents) created by the Comments: project through green infrastructure (affo
agriculture environment turkey soil erosion irrigation and drainage crop production europe and central asia agricultural technology natural disasters water resources rural community agriculture and food security safe drinking water climate change and agriculture investment project financing agricultural irrigation and drainage agricultural asset ecosystems and natural habitats mainstreaming and production landscape access to farm landscape management resilient infrastructure number of jobs crops and crop management systems improved water source sustainable landscape drinking water source improved livelihood flood control work flood control structure vehicle flow sustainable livelihood activities access to protection

Authors

Papageorgiou,Stavros

Disclosure Date
2021/10/01
Disclosure Status
Disclosed
Doc Name
Disclosable Version of the ISR - Turkey Resilient Landscape Integration Project (TULIP) - P172562 - Sequence No : 01
Originating Unit
ECA ENR PM (SCAEN)
Published in
United States of America
Rel Proj ID
TR-Turkey Resilient Landscape Integration Project (Tulip) -- P172562
Total Volume(s)
1
Unit Owning
ECA ENR PM
Volume No
1

Files

Related Topics

All