IN01046951 Percentage of female (of People provided with access to an improved water source under the project) (Percentage, Custom Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 51.00 51.00 50.00 IN01046952 ►Number of people in project areas provided with access to improved sanitation through social institutions. [...] IN01046953 Percentage of female (of People provided with with access to improved sanitation through social institutions (Percentage, Custom Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 51.50 51.50 50.00 IN01046954 ►Number of people in project areas provided with access to improved sanitation through incentive grant (Number, Custom) Baseline Actual (Previous) Actua [...] Strengthened capacity of the Recipient's institutions in the water supply and sanitation sector IN01046949 ►Operating Cost Coverage Ratio in project areas (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target 10/13/2021 Page 3 of 8 The World Bank Implementation Status & Results Report Sustainable Rural Water Supply and Sanitation Project (P154778) Value 0.17 0.25 0.39 1.00 Da [...] IN01046960 ►Number of social institutions in project areas connected to the water supply network (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 65.00 80.00 99.00 Date 30-Sep-2016 31-Mar-2021 15-Sep-2021 30-Jun-2025 On track: Exceeds the interim target. [...] IN01046963 ►Number of service providers with signed agreements with SES Department (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 18.00 20.00 40.00 Date 30-Sep-2016 30-Sep-2020 15-Sep-2021 30-Jun-2025 10/13/2021 Page 4 of 8 The World Bank Implementation Status & Results Report Sustainable Rural Water Supply and Sanitation Project (P154778) On track: Exceeds the
Authors
- Disclosure Date
- 2021/10/13
- Disclosure Status
- Disclosed
- Doc Name
- Disclosable Version of the ISR - Sustainable Rural Water Supply and Sanitation Project - P154778 - Sequence No : 12
- Originating Unit
- Water Africa 3 (SAEW2)
- Published in
- United States of America
- Rel Proj ID
- KG-Sustainable Rural Water Supply And Sanitation Project -- P154778
- Total Volume(s)
- 1
- Volume No
- 1