cover image: Briefing Note – Electric Vehicle Charging Infrastructure Costing Study opens in a new tab

20.500.12592/6xq3ts

Briefing Note – Electric Vehicle Charging Infrastructure Costing Study opens in a new tab

4 Apr 2022

EV Ready passenger vehicle sales to be zero emissions by parki ng is defined as a parking stall that 2035, which is well within the lifetime of new has an adjacent energized outlet at which residential buildings that would need to comply an EV supply equipment can be installed with the EV Ready requirements. [...] Future-proofing all residential parking spaces in The Challenge of Retrofitting EV new developments would ensure access to simple, reliable, and cost-effective at-home EV Charging in Multifamily charging for all households. [...] It is recommended that local governments stakeh olders, about the costs of m aking parking implement 100% EV Ready requirements for in new construction EV Ready, and the design residential parking in new developments to strategies that can help minimize these costs. [...] The report assessed the cost of implementing EV and to better enable and motivate residents Ready parking spaces in 4 residential to adopt EVs. [...] Canadian local governments are increasingly adopting 100% EV Ready residential parking requirements for new construction to avoid future challenges of providing EV charging infrastructure in multi-family buildings.
Pages
2
Published in
Canada