BSR GPTC Z380.1-2022 TR 2020-26-202x Correction of Notes for Testing

28 Mar 2022

These durations do not include the time to pressurize the test segments, time for temperature stabilization, or the time for depressurizing the test segments. [...] The test period should begin when the pressure of the test medium stabilizes. [...] See 4(d) and (e) of the guide material under §192.513 for an explanation of the calculations used to prepare this table. [...] (3) Whenever test pressure is 20% SMYS or greater and air, natural gas, or inert gas is the test medium, the line must be checked for leaks either by a leak test at a pressure greater than 100 psig but less than 20% SMYS or by walking the line while the pressure is held at 20% SMYS (§192.507(b)). [...] See 2 of the guide material under §192.509 and 4 of the guide material under §192.513.