BSR GPTC Z380.1-2022 TR 2017-30-202x Gathering Lines 192.9 192.801

28 Mar 2022

Section 192.179 1 VALVE SPACING ON OFFSHORE-ONSHORE PIPELINES (a) Where the distance between valves on a combined segment of a new offshore-onshore pipeline exceeds the valve spacing requirements for onshore pipelines, consideration should be given to the installation of a block valve at the nearest practical location to the land juncture of the pipeline segment. [...] Section 192.452 The operator should review the corrosion control records or perform field tests and surveys for the a pipeline to be being converted according to §192.14 or a newly regulated segment of gathering line to ensure that cathodic protection can be applied to the pipeline to meet the requirements of Subpart I within 12 months of the conversion or becoming regulated. [...] Section 192.616 1 GENERAL The public education program should be tailored to the type of pipeline operation (transmission, distribution, gathering) and the environment traversed by the pipeline. [...] (a) Before adjusting the operation of a pipeline by increasing pressure within the limits of the pipeline segment's MAOP, but substantially above a historical long-term operating pressure, the operator should consider a review of the operating, maintenance, and testing history for the segment. [...] … Section 192.743 4 GATHERING LINES (a) The MAOP of gathering lines could be protected by equipment that is located outside of the regulated segment of pipeline.

Authors

Miller, Lane D.

Pages
17
Published in
United States of America