cover image: Fee Schedule for Mechanical, Electrical, Plumbing/Gas Permits  103 - I.Required Documents and Outside Reviews

Premium

20.500.12592/71n2rb

Fee Schedule for Mechanical, Electrical, Plumbing/Gas Permits 103 - I.Required Documents and Outside Reviews

21 Dec 2021

HERS Rating When a HERS rating is required, a HERS rater shall provide the test for which the rating is required and provide a report to the owner or contractor. [...] If a project scope includes items that need plan review along with items that qualify for Simple Permits-MEP, the project does not qualify for Simple Permits–MEP and all items must be included in the permit scope to be plan reviewed. [...] If a plan review is required and one was not conducted as part of a building permit application, plans will be required and a plan review fee will be charged per Information Bulletin 501, in addition to the inspection fees per the fee schedule. [...] 3 This fee is in addition to the electrical circuit fees and is required for specialized occupancies as identified in Chapter 5 of the California Electrical Code. [...] Reference Table • San Diego Municipal Code, (SDMC) • Information Bulletin 116, Reporting Requirements for Hazardous Materials • Information Bulletin 187, How to Obtain a Permit for Electrical Vehicle Charging Stations • Information Bulletin 203, No-Plan Building Permit • Information Bulletin 208, Specifications for Gray Water Systems • Information Bulletin 301, How to Obtain a Permit for Installat.

Authors

Slifka, Dave

Pages
6
Published in
United States of America

Tables