Supply, Installation, Testing and Commissioning of Cooling Tower at  Manohar Parrikar Institute for Defence Studies and Analyses . Item

20.500.12592/vxx24g

Supply, Installation, Testing and Commissioning of Cooling Tower at Manohar Parrikar Institute for Defence Studies and Analyses . Item

9 Sep 2022

(c) Where the extra works are not of similar character and/or executed under similar conditions as aforesaid or where the omissions vary the conditions under which any remaining items of works are carried out or if the amount of any omission or additions relative to the amount of the whole of the Contract works or to any part thereof shall be such that in the opinion of the Employer the net rate o. [...] The Employer shall, during the progress of the works, have power to order in writing from time to time the removal from the works within such reasonable time or times, as may be specified in the order, of any materials which in the opinion of the Employer are not in accordance with the Specifications or the instructions of the Employer, the substitution of proper materials, and the removal and pro. [...] The Employer shall thereafter ascertain in writing under his hand what (if anything) shall be due or payable to, or by the Employer, for the value of the said plant and materials so taken possession of by the Employer and the expense or loss which the Employer shall have been put to in procuring the works to be completed, and the amount, if any, owing to the Contractor and the amount which shall t. [...] 4.26 Termination of Contract by Employer 4.26.1 If payment of the amount payable by the Employer shall be in arrears and unpaid for thirty days after notice in writing requiring payment of the amount as aforesaid shall have been Page 36 of 63 given by the Contractor to the Employer or if the Employer shall repudiate the Contract, or if the works be stopped for three months under the order of the E. [...] And when the works have been virtually completed and the Employer shall have certified in writing that they have been completed, the Contractor shall be entitled to the payment of the Final Balance in accordance with the Final certificate to be issued in writing by the Employer at the expiration of the period referred to as “the Defects Liability Period” in the Appendix hereto from the date of Vir.

Authors

Gopal Avasthi

Pages
63
Published in
India