Phase II  Nexus Assessment for the Drina River Basin

20.500.12592/4vtdqm

Phase II Nexus Assessment for the Drina River Basin

31 Oct 2022

BACKGROUND ON THE DRINA NEXUS ASSESSMENT The transboundary water cooperation framework in o the Sava River Basin Management Plan27; the Sava River Basin has great potential to support the application of the Nexus approach in the Drina o the Flood Risk Management Plan for the Basin. [...] 52 (2014-2016) was the first of its kind carried out Bearing in mind the usefulness of the Sava Nexus in the region, in order to generate information to Assessment for the riparian countries, both at the support the riparian countries and ISRBC in the national and transboundary levels, the countries implementation of FASRB, especially regarding of the Drina River Basin agreed to proceed with a fur. [...] MODELLING OF ENERGY-WATER SCENARIOS FOR SUSTAINABLE ENERGY DEVELOPMENT IN THE DRINA RIVER BASIN The UNECE Water Convention71 carried The section introduces water-energy planning out the Assessment of the water- questions in the Drina River Basin and food-energy-ecosystems Nexus in a number of transboundary basins, with the objectives of this analysis, and then the aim of supporting the authorities. [...] The phase-out of coal subsidies, as well as active participation in the Coal Region in In the context of the Drina Nexus Assessment, the Transition initiative for the Western Balkans86, is of overall prospected developments of the riparians’ high importance for the Drina countries. [...] The part of the model representing 28 limits of the electricity supply technologies, the hydropower generation inside the Basin is based characteristics and volume of hydro dams, the on simplified modelling of the hydroelectric natural water flows along the hydro cascade power plants and dams on the Drina River and its (including seasonal changes and longer-term tributaries.
Pages
97
Published in
Ghana