Allocation/award of work by way of issuance of work order by the states is beyond the scope of work and will be done at the discretion of respective states themselves, based upon consideration of the commercial bid obtained herein as also volume of work in the state. [...] 17.6 The number of PACS may undergo a change depending upon the willingness of the State Government to join the project and proposal/s submitted by the State Government for sanction under the project. [...] Scope of Work/ Description of Services The detailed scope of the work for System Integrators includes but not limited to the following points of the RFP :- 18.1 Preparatory work 18.1.1 Conduct of Ground Level Survey and formulation of schedule of activities. [...] 18.4 Integration and Data Migration 18.4.1 Integrate the software installed at the PACS with the National Data Repository to ensure that the data is stored at the Data Repository 18.4.2 To ensure complete migration of the PACS data to the NLDR including developing the migration roadmap identifying the constraints, risks and inhibitors to migration throughout the project period Page 26 of 208 18.4.. [...] 18.4.7 Identification of specific activities in the data migration process, preparation of detailed work breakdown structure for the data migration project and implementation of relevant migration plan with the coordination of NLPS and other stakeholders 18.4.8 To enable verification of data, rectification of errors, updation and validation of migrated data.
Authors
- Pages
- 208
- Published in
- India