T otal = 0 tCO 2 e Scope 2 To calculate its Scope 2 emissions, BIT has taken the total electricity usage figures f rom its office in London and added an estimate of the energy usage for staff in its office in M anchester, which has a number of workstations within a serviced office. [...] Total = 0 tCO 2 e Scope 2 To calculate its Scope 2 emissions, BIT has taken the total electricity usage figures from i ts office in London (NB we have moved office locations this FY) a nd added an estimate of the energy usage for staff in its office in Manchester, which has a number of workstations within a serviced office. [...] Total = 0 tCO 2 e S cope 2 To calculate its S cope 2 emissions, B IT has taken the total e lectricity usage figures from its office in London and added an estimate of the e nergy usage for staff in its o ffice in Manchester, which has a number of workstations within a serviced o ffice. [...] Total = 14.62 tCO 2e Total Emissions 32.52 tCO 2 e E missions reduction targets Context of our interim report This is our interim report and so we will be constructing our emission reduction targets and d etails on carbon reduction projects when we release our final report as it is likely t hat our figures will change a s we aim to i nclude other Scope 3 emissions like employee commuting. [...] Scope 1 and Scope 2 emissions have been reported in accordance with SECR requirements, and the required subset of Scope 3 emissions have been reported in accordance with the published reporting standard for Carbon Reduction Plans and the Corporate Value Chain (Scope 3) Standard 3.
- Pages
- 8
- Published in
- United Kingdom