cover image: Hunter Power Project - Construction Waste Management Plan

20.500.12592/x0k6knf

Hunter Power Project - Construction Waste Management Plan

15 Feb 2024

Its noted that the project site for the power station takes up only a fraction of the overall former smelter site that is the subject of the remediation EIS and RAP, and the capped waste stockpile and containment cell that are the primary components of the former smelter site management with respect to contamination and waste, are both outside and distant from the power station project area. [...] ▪ Ensure that the waste facility to which the waste is to be transported can lawfully accept waste of the type concerned. [...] Hunter Power Project 12 Construction Waste Management Plan 4.7 Classification of waste streams The classification of waste streams is to be done in accordance with the six-step process described in the EPA Waste Classification Guidelines Part 1: Classifying Waste (2014) – see Figure 4-2 to Figure 4-4and Appendix A (definitions). [...] It is a requirement the CEMS and all associated plans are reviewed and updated within three months of the following events: ▪ The submission of an environmental incident report ▪ The submission of an audit report ▪ The approval of any modification to the conditions of the Infrastructure Approval ▪ A direction of the Secretary. [...] The key aspects a non-compliance notification will address are: (a) the development and application number (12590060); (b) the condition of approval that the development is non-compliant with; (c) the way in which the development does not comply; (d) the reasons for the non-compliance (if known); and (e) the corrective and preventative actions undertaken to address the non-compliance.

Authors

Vazey, Rachel

Pages
31
Published in
Australia