cover image: Hunter Power Project - Construction Noise and Vibration Management Plan

20.500.12592/89324gp

Hunter Power Project - Construction Noise and Vibration Management Plan

15 Feb 2024

Changes made to the Construction Noise and Vibration Management Plan relate to the extension of time associated with the revised construction hours and the approval requirements provided by the Departmentas part of the OOHW Approval issued on the 14 September 2022. [...] NVIA 16 Prior to the commencement of the installation of the gas Prior to the Principal turbines, unless otherwise agreed by the Secretary, the commencement Contractor Proponent must ensure there is a suitable meteorological of the installation weather station operating located on the premises or at a of the gas turbines location approved by the EPA. [...] As part of the noise and vibration assessment process, the following outcomes must be developed: ▪ The identification of any noise and vibration impacts on nearby sensitive receivers as a result of those out of hours works ▪ The predicted noise and vibration levels at the impacted receivers, including the amount by which the noise and vibration levels are above the appropriate noise management lev. [...] The key aspects a non-compliance notification will address are: (a) the development and application number (12590060); (b) the condition of approval that the development is non-compliant with; (c) the way in which the development does not comply; (d) the reasons for the non-compliance (if known); and (e) the corrective and preventative actions undertaken to address the non-compliance. [...] 2 Discharges to Air and Water and Applications to Land P1 Location of monitoring/discharge points and areas P1.1 The following points referred to in the table below are identified in this licence for the purposes of monitoring and/or the setting of limits for the emission of pollutants to the air from the point.

Authors

Vazey, Rachel

Pages
114
Published in
Australia