cover image: Metrology Procedure Part B – minor amendment - Integrating energy storage systems in

20.500.12592/41ns745

Metrology Procedure Part B – minor amendment - Integrating energy storage systems in

19 Apr 2024

Approach to amendments AEMO is proposing to make a small number of further minor or administrative amendments to Metrology Procedure Part B (Proposed Amendments) to clarify the application of the previously amendments (Previous Amendments) made as part of AEMO’s consultation on the National Electricity Amendment (Integrating energy storage systems into the National Electricity Market (NEM)) Rule 2. [...] AEMO proposes to make the Proposed Amendments in accordance with NER 11.145.9(c), which allows AEMO to make minor or administrative amendments to existing consulted documents without following the relevant consultation process specified in the NER. [...] The Proposed Amendment is to clarify that the reference is to accommodate only the relevant connection points where the IRP is the FRMP, in the same manner as described above for clause 3.2(e). [...] These Proposed Amendments are not intended to change the meaning of the relevant clauses, but rather to avoid them being interpreted as applying to connection points to which they were not intended to be applied. [...] Consultation undertaken AEMO has undertaken preliminary consultation on: • Proposed Amendments 1 by notifying the Electricity Retail Consultative Forum of the nature of the Proposed Amendments and the consultation approach, and providing a written proposal and mark- up.
Pages
4
Published in
Australia