cover image: 2024 THOUGHT LEADERSHIP - BUILDING OUR WAY TO NET-ZERO: CARBON DIOXIDE PIPELINES IN THE

20.500.12592/jm644bs

2024 THOUGHT LEADERSHIP - BUILDING OUR WAY TO NET-ZERO: CARBON DIOXIDE PIPELINES IN THE

14 May 2024

To address such risks, pipelines and ancillary equipment are designed to minimize the Pipeline infrastructure in the US is supported by a well- risk of skin contact, and careful consideration is given to established industry with the technical expertise and the thermal properties of CO2 and the materials utilized tools needed to ensure they are designed, constructed, in pipeline construction. [...] The ILI unit is equipped with sensors PHMSA uses these datasets to monitor and improve that can detect and measure the thickness of the pipe pipeline transportation safety and inform the public and wall, the presence of corrosion, and other irregularities stakeholders about the risks and benefits of pipelines. [...] The more easement, the company may try to acquire the easement difficult the pipeline installation, the greater the through the power of eminent domain. [...] The soil movement is believed to have been caused by heavy rains in the area in the days and hours The specific conditions on that day, combined with leading up to the incident, combined with the area’s the unique landscape of the rupture area, resulted in topography and soil type. [...] to the combined effects of the local weather conditions, PHMSA also highlighted additional contributing factors the density of the CO2 (heavier than air), and the volume in the failure report: of CO2 released.
Pages
51
Published in
Australia