cover image: SO_OP_3717 Procedure for the Exercise of the Reliability and Emergency Reserve Trader

20.500.12592/kh18h75

SO_OP_3717 Procedure for the Exercise of the Reliability and Emergency Reserve Trader

7 Jun 2024

Publishing of reserve contract details Notices published in accordance with section 8 of the RERT Guidelines, including: • the name of each reserve contract counterparty; and • the volume and timing of the reserve contracted under each reserve contract will be published on AEMO’s website. [...] All unscheduled reserve contracts will require the provider of the unscheduled reserves to ensure that the unscheduled reserves the subject of the unscheduled reserve contract are not otherwise engaged for any of the trading intervals to which the contract with AEMO relates. [...] Selection of the particular reserve to be dispatched or activated will be based on a number of factors including, but not limited to the following: • ability to meet the requirement • cost • size of reserve blocks • length of dispatch or activation times AEMO | Doc Ref: SO_OP_3717 | 3 June 2024 Page 9 of 13 Procedure for the Exercise of the Reliability and Emergency Reserve Trader • dispatch or ac. [...] Enablement Lead Time means the maximum period required from the time the Reserve Provider receives an enablement instruction until the reserve equipment is: AEMO | Doc Ref: SO_OP_3717 | 3 June 2024 Page 10 of 13 Procedure for the Exercise of the Reliability and Emergency Reserve Trader (a) synchronised and its loading level becomes equal to the minimum operating level for slow start plant; (b) rea. [...] The reserve schedule ensures the PASA reserve calculation is accurate by modifying the load forecast to take into account the reduction in scheduled demand due to the activation of unscheduled reserve.

Authors

Fiona Reid

Pages
13
Published in
Australia

Table of Contents