The development objective of the Solid Waste Management Project for Gaza is to improve solid waste management services in the Gaza strip through provision of more efficient, environmentally, and socially sound waste management systems. Some of the negative impacts and mitigation measures include: (1) the installation of stormwater system, and must be regularly checked for damage and proper functioning; (2) sewage tanks should be periodically checked, emptied, and sewage should be taken to the WWTP to avoid wastewater generated at the site during construction; (3) domestic waste should be stored in containers and disposed when fill up; (4) all existing fencing shall be maintained to prevent access for illegal dumping; (5) dust suppressants, proper transporting, and storage of construction materials for air quality and noise; (6) use of mufflers and or noise dampers and regular maintenance of construction machines and trucks to avoid noise; (7) any spillage of waste, caused by any party during the closure activities, shall be cleaned up immediately and appropriately disposed; and (8) traffic signs to ensure proper routing and distribution of traffic.
Authors
- Disclosure Status
- Disclosed
- Doc Name
- Environmental and Social Management Plan for Deir Al-Balah Sanitary Landfill
- Document Date
- 2019-12-01
- Loan no
- 16835
- Published in
- United States of America
- Rel Proj ID
- GZ-Gaza Solid Waste Management Project -- P121648
- Total Volume(s)
- 1
- Unit Owning
- N/A
- Version Type
- Final
- Volume No
- 1