- Angola - EASTERN AND SOUTHERN AFRICA- P151224- Second Water Sector Institutional Development Project - Procurement Plan
- Lending Instrument
- Investment Project Financing
- Originating Unit
- Water Africa 3 (SAEW2)
- Pages
- 17
- Product Line
- IBRD/IDA
- Published in
- United States of America
- Rel Proj ID
- AO-Second Water Sector Institutional Development Project -- P151224
- TF No/Name
- TF0B6467-Building Dam Safety and Urban Resilience to Natural Hazards in Angola,TF0A4832-Angola: Support to the water sector reform through a pilot PPP transac,TF0A4967-Angola: Support to the water sector reform through a pilot PPP transac,TF0B4541-Angola and Sao Tome e Principe â Strengthening the water and sanit,TF0B8682-CREST - Angola : Water PPP Program Development,TF0B8715-Angola : Water PPP Program Development,TF0B9269-PROMOTING SUSTAINABILITY IN WATER SERVICES IN ANGOLA,TF0C3014-Roadmap Towards Universalization of Resilient and Inclusive Sanitation
- Unit Owning
- Water Africa 3 (SAEW2)
- Version Type
- Final
Table of Contents
- I. General 1
- 1. Banks approval Date of the procurement Plan 1
- Original August 19 2016 Updated Procurement Plan April 2017 1
- 2. Dec 24 2015 1
- Date of General Procurement Notice 1
- 3. The procurement period of project covered from August 2016 December 2017 1
- Period covered by this procurement plan 1
- 1. Prior Review Threshold 1
- Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement 1
- Above or equal to US 2000000 1
- All 1
- Below US 2000000 None 1
- Below US 100000 None 1
- Above US 10 million All 1
- Below US 10 million None 1
- Below US 100000 None 1
- 2. Prequalification 1
- . Bidders for shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 1
- 3. Proposed Procedures for CDD Components as per paragraph. 3.17 of the Guidelines 1
- 4. Reference to if any Project OperationalProcurement Manual 1
- NA at this stage 1
- 5. Any Other Special Procurement Arrangements 1
- 5 ICB works packages are eligible to be financed under retroactive financing 1
- 128.1 8 No Prior 2
- 1.8 1 No Prior 2
- 19 3 No Post 2
- 4.8 1 No Prior 2
- 0.27 1 No Post 2
- 1. Prior Review Threshold 2
- Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants 2
- 2. Short list comprising entirely of national consultants 300000 2
- 7. 3. Any Other Special Selection Arrangements 3
- 5 QCBS works packages are eligible to be financed under retroactive financing 3
- 4. Consultancy Assignments with Selection Methods and Time Schedule 4
- US million 4
- Summary of number of contracts that will be let under QCBS 4
- 38.1 13 Prior 4
- Summary of number of contracts that will be let under other methods 4
- 0.93 3 Prior CQS 4
- Summary of number of contracts that will be let under ICS 4
- 4.4 7 Prior 4