Authors
- Disclosure Date
- 2024/07/11
- Disclosure Status
- Disclosed
- Doc Name
- Concept Project Information Document (PID)
- Lending Instrument
- Investment Project Financing
- Pages
- 13
- Product Line
- IBRD/IDA
- Published in
- United States of America
- Rel Proj ID
- BR-Brazil Proactive, Safe, And Resilient Road Asset Management Pro -- P505590
- Unit Owning
- Transport-LAC (ILCT1)
- Version Type
- Final
Files
Table of Contents
- The World Bank 1
- The World Bank 2
- BASIC INFORMATION 2
- A. Basic Project Data 2
- Proposed Development Objectives 2
- PROJECT FINANCING DATA US Millions 2
- Maximizing Finance for Development 2
- Is this an MFD-Enabling Project MFD-EP 2
- Is this project Private Capital Enabling PCE 2
- SUMMARY 2
- Total Operation Cost 350.00 2
- Total Financing 349.50 2
- Financing Gap 0.50 2
- DETAILS 2
- World Bank Group Financing 2
- The World Bank 3
- Non-World Bank Group Financing 3
- B. Introduction and Context 3
- Brazils economy is recovering from a decade of sluggish growth and a recent economic recession deepened by 3
- Brazil remains a highly heterogenous country where low- and high-income realities coexist and where strong 3
- Bolsa Família Brazils 3
- The World Bank 4
- Brazil faces significant climate change challenges compounded by deforestation and land degradation. 4
- Transport services and logistics performance in Brazil are hindering the countrys ability to compete globally 4
- Custo Brasil 4
- Investment in infrastructure and maintenance has been neglected by successive Governments for years. 4
- The World Bank 5
- Confederação Nacional do Transporte CNT CREMA 5
- The World Bank 6
- Brazil faces severe environmental challenges including deforestation flooding landslides and water scarcity. 6
- Transport is one of the main sources of greenhouse gas GHG emissions in the energy sector in Brazil and is the 6
- The World Bank 7
- Road traffic deaths and injuries are a significant issue in Brazil. 7
- Lack of access to opportunities exacerbates social exclusion and poverty rates. 7
- Quilombolas 7
- The World Bank 8
- C. Proposed Development Objectives 8
- Improved access to sustainable transport 8
- Improved safe road transport access 8
- Improved resilient road transport access 8
- D. Concept Description 8
- The fourth phase of the MPA 8
- Mato Grosso do Sul is a relatively recent State created in 1979 located in the Center-West Region of Brazil is 8
- It is a fast-growing State that requires good management of its infrastructure to accompany the transition of its 8
- In the face of its logistics challenges Mato Grosso do Sul has developed an ambitious plan to develop its road 8
- The World Bank 9
- Banco Nacional de Desenvolvimento 9
- Mato Grosso do Sul which experimented its first PBC in 2012 sees the CREMA 2.0 approach as an opportunity 9
- 1. Component 1 Proactive maintenance with long-term Performance-Based CREMA contracts - total 9
- 1. Subcomponent 1.1 9
- Subcomponent 1.2 9
- 2. Component 2 Institutional strengthening for sustainable road asset management improved road 9
- The World Bank 10
- . The institutional strengthening will cover activities strategically selected in the themes below 10
- 1. Sustainable Asset Management 10
- 2. Climate resilience and Environmental Preservation 10
- 3. Social Inclusion and Gender 10
- 3. Component 3 Road Safety Improvement 10
- 1. Subcomponent 3.1 Resolution of road safety critical spots affecting state public 10
- Subcomponent 3.2 Improvement of the States road safety management 10
- 4. Component 4 Project management total estimated cost US5 million covered by IBRD financing. 10
- Mato Grosso do Sul is at the forefront of the PPP agenda in Brazil and had already created the institutions and 10
- PROGRAMA DE PARCERIAS ESTRATEGICAS Escritorio de Parcerias Estrategicas 10
- The World Bank 11
- To tackle Mato Grosso do Suls high rate of traffic accidents the Project includes a specific component that aims 11
- Biodiversity is a particularly relevant subject in Mato Grosso do Sul considering the existing biomes in the State 11
- Power BI 11
- Triggered 11
- Last approved Current 11
- The World Bank 12
- Environmental risk is 12
- Social risk is 12
- CONTACT POINT 12
- World Bank 12
- BorrowerClientRecipient 12
- Secretaria da Fazenda 12
- Implementing Agencies 12
- The World Bank 13
- Escritório de Parcerias Estratégicas do Governo do Estado de Mato Grosso do Sul 13
- FOR MORE INFORMATION CONTACT 13
- APPROVAL 13
- Approved By 13