Authors
- Disclosure Date
- 2024/07/11
- Disclosure Status
- Disclosed
- Doc Name
- India - SOUTH ASIA- P148531- Uttarakhand Health Systems Development Project - Procurement Plan
- Lending Instrument
- Investment Project Financing
- Originating Unit
- Health Nutri & Population SAR 1 (HSAHN)
- Pages
- 13
- Product Line
- IBRD/IDA
- Published in
- United States of America
- Rel Proj ID
- IN-Uttarakhand Health Systems Development Project -- P148531
- Unit Owning
- Health Nutri & Population SAR 1 (HSAHN)
- Version Type
- Final
Table of Contents
- IN UTTARAKHAND HEALTH SYSTEM DEVELOPMENT PROJECT UKHSDP P148531 1
- I. General 1
- 1. Banks approval Date of the procurement Plan 1
- Date of General Procurement Notice 1
- Period covered by this procurement plan 1
- II. Goods and Works and non-consulting services. 1
- 1. Prior Review Threshold 1
- Above US 2 million All 1
- Above US 2 million All 1
- Above US 10 million All 1
- Above US 10 million All 1
- Above US 2 million All 1
- Above US 30000 1
- Procurement Methods and Threshold 1
- Category Method of Procurement 1
- Threshold US Equivalent 1
- ICB 3000000 1
- LIB Wherever agreed by the Bank 1
- NCB Up to 3000000 with NCB conditions 1
- Shopping Up to 100000 1
- DC As per Para 3.7 of the Bank Guidelines 1
- Force Account As per Para 3.9 of Guidelines 1
- Goods and Non- consultant services 1
- Framework Agreements 1
- As per Para 3.6 of Guidelines 1
- Category Method of Procurement 2
- Threshold US Equivalent 2
- ICB 40000000 2
- NCB Up to 40000000 with NCB conditions 2
- Shopping Up to 200000 2
- Force Account As per Para 3.9 of Guidelines 2
- DC As per Para 3.7 of Guidelines 2
- Works 2
- Community Participation 2
- As per Para 3.19 of Guidelines 2
- Works 2
- Goods 2
- 2. Pre-qualification 2
- 3. Proposed Procedures for CDD Components as per paragraph. 3.17 of the Guidelines 2
- 4. Reference to Project OperationalProcurement Manual 2
- 5. Any Other Special Procurement Arrangements 3
- Summary of the Procurement Packages planned during the first 18 months after project effectiveness 4
- III. Selection of Consultants 4
- 1. Prior Review Threshold 4
- 2. Short list comprising entirely of national consultants 4
- 3. Any Other Special Selection Arrangements 5
- 4. Consultancy Assignments with Selection Methods and Time Schedule 5