Authors
- Disclosure Date
- 2024/07/14
- Disclosure Status
- Disclosed
- Doc Name
- Disclosable Version of the ISR - Second Urban Infrastructure Project - P132386 - Sequence No : 19
- Lending Instrument
- Investment Project Financing
- Pages
- 9
- Product Line
- IBRD/IDA
- Published in
- United States of America
- Rel Proj ID
- UA-Second Urban Infrastructure Project -- P132386
- TF No/Name
- TF0A4662-Ukraine - Second Urban Infrastructure Project - MDB Fees,TF017112-Second Urban Infrastructure Project (UIP2) - CTF Loan TF,TF017382-PREPARATION OF UKRAINE: URBAN INFRASTRUCTURE PROJECT â 2 (UIP2),TF0C0039-Integrating resilience for âbuilding back betterâ the water s
- Unit Owning
- Water Europe and Central Asia (SCAWA)
- Version Type
- Final
Table of Contents
- The World Bank 1
- 1.OBJECTIVE 1
- 1.1 Development Objective 1
- 2.COMPONENTS 1
- 3. OVERALL RATINGS 1
- 4. KEY ISSUES STATUS 1
- The World Bank 2
- 4.1 Implementation Status and Key Decisions 2
- 5. SYSTEMATIC OPERATIONS RISK-RATING TOOL 2
- The World Bank 3
- 6. RESULTS 3
- 6.1 PDO Indicators by PDO Outcomes 3
- To improve quality of wastewater services 3
- Volume mass of BOD pollution loads removed by treatment plants. 3
- To improve quality of solid waste services 3
- Industrial or municipal solid waste recycled in Kharkiv 3
- To improve efficiency of water wastewater and solid waste services 3
- The World Bank 4
- The World Bank 5
- 6.2 Intermediate Results Indicators by Components 5
- Component 4 Contingent Emergency Response 5
- Component 1 Urban Infrastructure Improvement 5
- The World Bank 6
- Component 2 Institutional Strengthening and Capacity Building 6
- The World Bank 7
- The World Bank 8
- 7. DATA ON FINANCIAL PERFORMANCE 8
- 7.1 Cumulative Disbursements 8
- 7.2 Disbursements by loan 8
- 7.3 Key Dates by loan 8
- The World Bank 9
- 8. KEY DATES 9
- 9. RESTRUCTURING HISTORY 9
- 10. ASSOCIATED OPERATIONS 9