Where practical IBAs are to be emailed to the NCCNIBA@artc.com.au the day prior to the Closedown, the IBA must contain the Network Control Board for the IBA in the Subject field. [...] Before booking out level crossing warning equipment the Competent Worker must check with the PPO to ensure no rail traffic is approaching the level crossing and advise the PPO of the name and contact number of the Handsignaller at the level crossing. [...] The Worksite Protection Officer will be responsible for: - briefing the workers of the Coordinated Worksite protection arrangements, and - coordinating all rail traffic movements within their worksite limits, and - for the protection of workers from rail traffic within their individual worksite limits, and - for the protection of workers from rail traffic on adjacent live lines Note: The Coordinat. [...] New Worksites Entering the LPA: Where a new workgroup is to establish a worksite in a section where Lookout Working is in place • The PPO must advise the PO of the workgroup of the Lookout Working workgroup contact details and the Lookout Working limits, • The new workgroup PO must contact the PO for the Lookout Working workgroup and make agreed arrangements for the works to be completed, • If the. [...] Entering an existing worksite: Prior to entering an existing worksite in the corridor, the PO for the Lookout Working Workgroup must: • Contact the PO for the worksite and, • Gain authority from the PO to enter the pre-existing worksite and, • Get briefed into the worksite by the PO, and • Inform the PPO that the Lookout Working Workgroup has entered an existing worksite location Exiting an existi.
Authors
- Pages
- 11
- Published in
- Australia
Table of Contents
- HUNTER VALLEY 1
- AUGUST MEGA SOUTH 1
- CLOSEDOWN 1
- Hunter Valley Closedown Briefing Document 1
- Local Possession Authority 1
- Using a Local Possession Authority 1
- Work Trains 1
- Track Vehicles 1
- Piloting Trains and Track Vehicles 1
- Planning Work in the Rail Corridor 1
- Lookout Working 1
- Lookouts 1
- Level Crossings 1
- Protecting Type F Level Crossing 1
- On Site Testing of Type F Level Crossing 1
- Using Emergency Roadside Warning Equipment 1
- Infrastructure Booking Advice 1
- Using Infrastructure Booking Advices 1
- Network communication 1
- Spoken and Written Communication 1
- Possessions Web page - httpswww.artc.com.auworkhunter-valley-possessions-management 1
- HUNTER VALLEY 2
- AUGUST MEGA SOUTH 2
- CLOSEDOWN 2
- CLOSEDOWN TIMELINE 2
- START UP 2
- 0430 hours Sat 3 August 2
- Protection Officers ring on worksite protection at 500m applies. 2
- HANDBACK 2
- 0130 hours Tue 6 August 2
- All Stages Certified and off track. 2
- CLOSEDOWN CONTACTS 2
- 0500 0900 2
- 02 4979 7016 2
- PHONE PROTOCOL 2
- HUNTER VALLEY 3
- AUGUST MEGA SOUTH 3
- CLOSEDOWN 3
- CLOSEDOWN PROTOCOL 3
- HUNTER VALLEY 4
- AUGUST MEGA SOUTH 4
- CLOSEDOWN 4
- HUNTER VALLEY 5
- AUGUST MEGA SOUTH 5
- CLOSEDOWN 5
- Communication Flow Chart 5
- WORKSITE SUPERVISORS 5
- HUNTER VALLEY 6
- AUGUST MEGA SOUTH 6
- CLOSEDOWN 6
- HUNTER VALLEY 7
- AUGUST MEGA SOUTH 7
- CLOSEDOWN 7
- HUNTER VALLEY 8
- AUGUST MEGA SOUTH 8
- CLOSEDOWN 8
- HUNTER VALLEY 9
- AUGUST MEGA SOUTH 9
- CLOSEDOWN 9
- HUNTER VALLEY 10
- AUGUST MEGA SOUTH 10
- CLOSEDOWN 10
- HUNTER VALLEY 11
- AUGUST MEGA SOUTH 11
- CLOSEDOWN 11