cover image: Resettlement Plan Sava and Drina Rivers Corridors Integrated Development Program (P168862)

20.500.12592/fv90vd

Resettlement Plan Sava and Drina Rivers Corridors Integrated Development Program (P168862)

21 Jul 2020

This Sub-project "Jarak" defines technical solutions and necessary construction works for the rehabilitation of the left bank of the Sava River in the area between settlements of Jarak and Hrtkovci, from rkm 121+277 to rkm 123+350 of river Sava, in order to prevent further erosion of the left bank due to the flow of the river in the river bend, weak resilience of soil on the left bank and narrowed [...] The current state of the coast requires urgent rehabilitation work on the protection of the left bank in order to stop the eroding and collapsing of the coast, and flood protection. [...] This Sub-project determines technical solutions and necessary works on the rehabilitation of the river coast between Jarak and Hrtkovci, on the left bank of the Sava River from rkm 121+277 to rkm 123+350 in order to prevent further 14 collapsing of the left bank due to river flow in the curve and poor resistance of the left bank, to rehabilitate existing damage and permanently stop the erosion pro [...] The following are some of the expected benefits from the proposed reconstruction of the left bank of the river Sava and flood control in the context of implementation of the Sub-project: • to stop further erosion of the soil at the left river bank in the Sub-project designated area; • upgrading of embankment from the 1:25 year flood to the 1:100 year flood; • to avoid damages of agriculture produc [...] Two main indicators of educational structure of the population, educational attainment and literacy, present the level of population education, also involving the achieved level of socio-economic development in general and was superficially explored to determine the adequate communication tool and method in the course of engagement of the PAPs in general.
land use involuntary resettlement value added tax social impact public consultation support policy rights of way flood protection integrated water resources management nature-based solutions water supply system land acquisition and resettlement environmental and social safeguard law and regulation loss of income access to asset collected information institutional capacity building loss of land expropriation of property land use restriction real estate valuation parcel of land below the poverty line grievance redress service flood risk management river basin management flood protection infrastructure public water follow up survey impact of flood compensation for loss climate change adaptation strategy river basin planning development of tourism river training works climate change projections right to appeal corridor of impact drainage and irrigation leave bank protection against flood flood protection embankment compensation for expropriated property process of acquisition

Authors

Kiss,Agnes I.

Disclosure Date
2020-07-21
Disclosure Status
Disclosed
Doc Name
Resettlement Plan Sava and Drina Rivers Corridors Integrated Development Program (P168862)
Originating Unit
Environment & Social Std Policy (OPSSP)
Published in
United States of America
Rel Proj ID
P168862,7B-Sava And Drina Rivers Corridors Integrated Development Program -- P168862
Unit Owning
Water Europe and Central Asia
Volume No
1

Files

Related Topics

All