- TOR ESIA for Upgrade of Belize City Wastewater Treatment Plant Belize Blue Cities and Beyond Project (P181064)
- Lending Instrument
- Investment Project Financing
- Pages
- 36
- Product Line
- IBRD/IDA
- Published in
- United States of America
- Rel Proj ID
- BZ-Belize Blue Cities And Beyond Project -- P181064
- TF No/Name
- TF0C3138-PMI Belize JIT Support,TF0C2667-G212 3.2-BZ-Assessing the Blue Economy Potential of Belizes Coastal Cit,TF0C2677-G212 4.3-BZ-Assessing the Blue Economy Potential of Belizes Coastal Cit,TF0C2728-G212 1.2-BZ-Assessing the Blue Economy Potential of Belizes Coastal Cit,TF0C2830-G212 2.3-BZ-Assessing the Blue Economy Potential of Belizes Coastal Cit,TF0C4771-Belize : Supporting Blue Economic Development by Enabling Private Secto
- Unit Owning
- LAC ENB 1 (SLCE1)
- Version Type
- Final
Table of Contents
- 1 INTRODUCTION 5
- 2 BACKGROUND 5
- 3 OBJECTIVES OF THE CONSULTANCY 8
- 4 SCOPE OF WORK 9
- Task 1: Environmental and Social Description of the Existing WWTP 9
- Task 2: Description of the Proposed Project 9
- Task 3: Legal and Institutional Framework 10
- Task 4: Baseline Data 10
- Task 5: Audit of the Environmental and Social Aspects of the Existing WWTP. 11
- Task 6: Assessment of Environmental and Social Risks and Impacts 12
- Task 7: Environmental and Social Management Plan 13
- Task 8: Analysis of Alternatives 13
- Task 9: Stakeholder Engagement 14
- Task 10: Grievance Mechanism (GM) 14
- Task 11: Environmental and Social Capacity Assessment 14
- 5 TIMETABLE AND DELIVERABLES 14
- Deliverable 1: Environmental and Social Assessment Report 14
- Deliverable 2: BWS Environmental and Social Capacity Assessment Report 15
- Deliverable 2: Environmental, Social, Health & Safety (ESHS) Requirements for the Bidding Documents 15
- 6 KEY STAFFING REQUIREMENTS 15
- 7 DURATION OF THE CONSULTANCY 16
- 8 REPORTING REQUIREMENTS 16
- The environmental and social assessment report and the ESMP shall be concise and limited to significant environmental and social issues. The main text must focus on findings, mitigation measures, conclusions, and recommendations, supported by summary ... 16
- LOGISTICS 16
- 9 CODE OF CODUCT (CoC) 16
- 10 Annex I: Structured Process for the Borrower Capacity Assessment 17
- STEP 1: Identify key Environmental and Social (E&S) tasks 17
- STEP 2: Mapping the Institutions and other Actors 19
- STEP 3: Analyse institutional arrangements and linkages 22
- STEP 4: Assess the capacity of individual institutions 23
- STEP 5: Recommend actions to strengthen institutional capacity 26
- STEP 6: Monitor capacity development indicators and adapt activities as needed 27
- 11 Annex II: Potential indicators to assess E & S capacity development 29