- P500501 - Draft Environmental and Social Systems Assessment (ESSA) - Electrification and Improvement of the São Paulo Urban Transport Project
- Pages
- 62
- Published in
- United States of America
- Rel Proj ID
- BR-Electrification And Improvement Of The São Paulo Urban Transpor -- P500501
- Unit Owning
- Transport-LAC (ILCT1)
- Version Type
- Final
Files
Table of Contents
- P500501 - DRAFT ENVIRONMENTAL AND SOCIAL SYSTEMS ASSESSMENT ESSA - IMPROVEMENT OF THE SÃO PAULO URBAN TRANSPORT PROJECT 1
- 1.1. Thematic Scope 3
- 1.2. Geographic Scope 3
- 1.3. Institutional Arrangement 3
- 2.1. Likely Environmental and Social Effects 3
- 2.2. Contextual Risk Factors 3
- 2.3. Institutional Capacity and Complexity Risk 3
- 2.4. Reputational and Political Risks 3
- Core Principle 1 3
- Core Principle 2 3
- Core Principle 3 3
- Core Principle 4 3
- Core Principle 5 3
- Core Principle 6 3
- 4.1. Interviews with Key Stakeholders 3
- 4.2. Virtual Meeting with COMFROTA 3
- Overall Findings on Environmental and Social Risks of the Program 3
- On the Adequacy of the Environmental and Social Management System 3
- Introduction and Methodology 4
- Results Area 1 4
- Results Area 2 4
- Results Area 3 4
- 1. Program Description 7
- Table 1 Trends of GHG Emissions of São Paulos Bus Fleet ton 8
- Map 1 Regions and Districts of the City of São Paulo 10
- Map 2 2010 IPVS 11
- Observatório de Indicadores da Cidade de São Paulo ObservaSampa 11
- Mapa da Desigualdade de São Paulo 12
- Figure 1 Spatial Segregation in the City of São Paulo 12
- Map 3 São Paulo City Public Transport Network 13
- 2. Description of Expected Environmental and Social Effects of the Project 17
- In short 20
- In short 26
- Low 26
- In short 27
- Low 27
- 3. Assessment of the Borrowers Environmental and Social Management System 28
- The national Occupational Health and Safety standards require the offer of 36
- Delegacias Regionais do Trabalho 37
- Ministério Público do Trabalho custos legis 37
- In sum this assessment finds the Borrowers system robust and able to ensure the protection of the public and worker safety against the potential risks associated with the Project in a proper manner. 39
- Figure Parcel of the population whose houses are within 300 meters from bus stops by district 2022 42
- Figure - IPTC District Inequality in São Paulo 2022 43
- 4. Stakeholder Consultations 49
- 5. Overall Findings of the ESSA 54
- 6. Action Plan 57