Climate Change Technical Note : Bangladesh Bay Terminal Marine Infrastructure Development Project (English)

9 Sep 2024

The Project's largest investment is in the breakwater. The breakwater (sub-component 1a) is planned on an existing sandbar, which already in itself provides protection for the proposed port operations but may not be adequately resilient to ensure continuity of port operations due to the climate exacerbated hazards such as storm surge, cyclones, and sea-level rise. The existing sand bar will be the base case for assessing continuity of port operations given its existing level of protection for port operations. As a result, adaptive measures are presented to ensure continuity of port operations against climate exacerbated risks. It is presented to stabilize the existing sandbar through concrete piling (1 meter diameter piles spaced 3 meters apart across the sand bar) and vertical drains and build a rubble-mound breakwater with armor layer protection on top of the sand bar. Concrete mattresses are also presented to prevent scour around the base of the breakwater as erosion will be exacerbated by fluvial discharge into the Bay of Bengal.
bangladesh climate change marine protected areas water public transport urban development climate change adaptation climate change mitigation natural resources drylands regional integration south asia transport economics agriculture and food security transport governance healthy oceans river basin management erosion control water security and integrated resource management urban transport policy and planning marine transport modes of transport transport and sustainable development transport impact on the environment transport and climate change low-emissions transport

Authors

World Bank

Disclosure Date
2024/09/09
Disclosure Status
Disclosed
Doc Name
Climate Change Technical Note : Bangladesh Bay Terminal Marine Infrastructure Development Project
Pages
10
Published in
United States of America
Rel Proj ID
BD-Bay Terminal Marine Infrastructure Development Project -- P176812
TF No/Name
TF0B9591-Improving Chattogram Port Rail Connectivity,TF0C1002-Bangladesh : Maritime Port Sector Reform,TF0C3562-Building a Climate and Disaster Resilient Bay Terminal,TF0C3864-Bangladesh : Strengthening the PPP Institutional and Regulatory Framewo,TF0C3971-Bangladesh Bay Terminal Project
Unit Owning
Transport-SAR (ISAT1)
Version Type
Final
Volume No
1

Table of Contents

Related Topics

All