If a Facility or Separately Certified Component fails a Reserve Capacity Test, AEMO will: (a) notify the Market Participant that the Facility or Separately Certified Component has failed the Reserve Capacity Test; (b) provide the Market Participant with a copy of the results of the Test; and (c) where the Reserve Capacity Test was a first Test, re-test the Facility or Separately Certified Componen. [...] If a Facility or Separately Certified Component passes the Reserve Capacity Test, AEMO will: (a) notify the Market Participant that the Facility or Separately Certified Component has passed the Reserve Capacity Test; and (b) provide a copy of the results of the Test. [...] AEMO will deem a Reserve Capacity Test to be an Invalid Test if: (a) the temperature measured by the Temperature Measurement System specified in WEMS for the Facility is outside of the range 0°C to 45°C, and paragraph 5.2.3(b) does not apply; (b) AEMO considers that there is an error in the data used to determine the results of the Test, such an error or errors in Meter Data Submissions, including. [...] If a Reserve Capacity Test is deemed to be an Invalid Test under paragraph 5.2.121, then AEMO will: (a) re-conduct the Reserve Capacity Test as soon as practicable in accordance with paragraph 5.1, with consideration to the timelines in clauses 4.25.1, 4.25.4, and 4.25.5; or (b) use the results of the latest Reserve Capacity Test in place of the Invalid Test, where another Reserve Capacity Test ha. [...] AEMO will record the following about Reserve Capacity Tests: (a) information regarding the conduct of the Reserve Capacity Test; (b) the results of the Reserve Capacity Test; (c) the determination of the outcome of the Reserve Capacity Test (passed or failed); and (d) information regarding any action taken in accordance with clauses 4.25.2D, 4.25.4, or 4.25.6, as applicable.
Authors
- Pages
- 18
- Published in
- Australia
Table of Contents
- Version Release History 2
- Contents 3
- Tables 4
- 1. Introduction 5
- 1.1. Purpose and scope 5
- 1.2. Definitions 5
- 1.3. Interpretation 6
- 1.4. Related documents 6
- 1.5. Communications and provision of information 7
- 2. Preparatory steps 7
- 2.1. Temperature Dependence Curves 7
- 2.2. Temperature measurement sources 9
- 2.3. Required Level calculation 10
- 3. Verification by Observation for Non-Intermittent Generating Systems or Electric Storage Resources 11
- 4. Verification Tests for Demand Side Programmes 12
- 5. Reserve Capacity Tests 12
- 5.1. Conducting Reserve Capacity Tests 12
- 5.2. Assessing the results of Reserve Capacity Tests 13
- 5.3. Capacity Credit reductions 15
- 5.4. Reserve Capacity re-test under clause 4.25.5 15
- 5.5. Recording and publishing Reserve Capacity Test results 16
- 6. Reviewing results 16
- Appendix A. Relevant clauses of the WEM Rules 18