Authors
Related Organizations
- Disclosure Date
- 2024/10/08
- Disclosure Status
- Disclosed
- Doc Name
- Environmental and Social Management Plan (ESMP) Msimbazi Basin Development Project (P169425)
- Lending Instrument
- Investment Project Financing
- Pages
- 104
- Product Line
- IBRD/IDA
- Published in
- United States of America
- Rel Proj ID
- TZ-Msimbazi Basin Development Project -- P169425
- TF No/Name
- TF0B6164-2.2.-TZ-Coastal City Strategies for Prevention of Generation and Transp,TF0B8902-Optimizing infrastructure and services for informal traders and communi,TF0C2822-Tanzania â Planning and Policies for Resilience in Dar-Es-Salaam
- Unit Owning
- Urban DRM AFR East and South 2 (IAEU2)
- Version Type
- Final
Table of Contents
- EXECUTIVE SUMMARY 6
- ABBREVIATIONS 6
- LIST OF TABLES 6
- LIST OF FIGURES 6
- 1.0 INTRODUCTION 6
- 2.0 PROJECT DESCRIPTION 6
- 3.0 BASELINE OR EXISTING ENVIRONMENTAL CONDITION 7
- 4.0 STAKEHOLDERS CONSULTATIONS AND INVOLVEMENT 7
- 5.0 ENVIRONMENTAL AND SOCIAL IMPACTS 7
- 6.0 ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN 8
- 7.0 ENVIRONMENTAL AND SOCIAL MONITORING PLAN 8
- 8.0 DEMOBILIZATION 8
- 9.0 SUMMARY AND CONCLUSIONS 9
- APPENDICES 9
- Appendix III Minutes of stakeholders Consulted 9
- Table 2-1. Location of subprojects in Dar es Salaam 14
- Figure 2-1 Map of MBDP-CERC interventions in Dar es Salaam 16
- Figure 2-2 Location of the Kigogo Bridge 17
- Figure 2-3 Overtopping at Kigogo Figure 2-4 Inundation around Kigogo area 18
- Figure 2-5 Mkwajuni area 18
- Figure 2-6 Existing Situation at Mkwajuni 19
- Figure 2-7 Location of Geti Jeusi culvert 20
- Figure 2-8 Location and impact occur at AmaniGomvu Box culvert area. 20
- Figure 2-9 Location and impact at Kisarawe II 21
- Figure 2-10 Existing situation at Kisarawe II 22
- Figure 2-11 Location of Mikadi Box culvert 22
- Figure 2-12 Location of the proposed Nguva bridge 23
- Location of proposed Mtongani Bridge 24
- Location of Kigamboni Drainage 24
- Table 2-2 Storm water drainage system along Morocco - Kawe roundabout road in Kinondoni 25
- Table 2-3 Types and Sources of Construction Materials for CERC Interventions in Dar es Salaam 27
- Figure 3-1 Rainfall Pattern at JNIA Hydrometry 31
- Figure 3-2 Soil Types and Textures in the Catchments 32
- Mangifera indica Azandiracta indica Solanum macranthum Bambusa vulgaris Nerium oleander Tectona glandis 36
- Hibiscus rosa-sinesis Elephant grasses Chick weed Star grasses Hyperhenia species Bidens pilosa. 37
- Figure 3-3 Typical Vegetation in the project areas 37
- Table 4-1 Stakeholders Consultation and Views 40
- Potential impacts associated with MBDP CERC interventions 46
- Table 6-1 Mitigation Plan for Negative Environmental and Social Impacts 65
- Table 7-1Matrix of Environmental and Social Monitoring Plan for CERC activities 72