- Uzbekistan - EUROPE AND CENTRAL ASIA- P166447- Uzbekistan: Strengthening the Social Protection System Project - Procurement Plan
- Lending Instrument
- Investment Project Financing
- Originating Unit
- Social Protection & Labor ECA (HECSP)
- Pages
- 9
- Product Line
- IBRD/IDA
- Published in
- United States of America
- Rel Proj ID
- UZ-Uzbekistan: Strengthening The Social Protection System Project -- P166447
- Unit Owning
- Social Protection & Labor ECA (HECSP)
- Version Type
- Final
Table of Contents
- July 9 2010 1
- Strengthening the Social Protection system projectP166447 1
- I. General 1
- 2. Original May 14 2019 1
- Banks approval Date of the procurement Plan 1
- 3. November 2019 1
- Date of General Procurement Notice 1
- 4. The procurement period of project covered from year May 2019 to November 2021 1
- Period covered by this procurement plan 1
- 1. Prior Review Threshold 1
- Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement 1
- Above US 1500000 1
- None BDs shall be acceptable to the Bank 1
- Above US 5 million 1
- None BDs shall be acceptable to the Bank 1
- None 1
- 2. Prequalification 1
- . Bidders for Not applicable shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 1
- 3. Proposed Procedures for CDD Components as per paragraph. 3.17 of the Guidelines 1
- Not applicable 1
- 4. Reference to if any Project OperationalProcurement Manual 1
- Project Implementation Manual Project to be completed yet 1
- 5. Any Other Special Procurement Arrangements 1
- July 9 2010 2
- Bidding documents including contract forms acceptable to the Bank shall be used. 2
- The Bidding process shall not be cancelled sole on the reason that minimum bid price is larger than the amount allocated by procuring entity for this procurement. 2
- There shall be no preference applied during procurement of goods and works. 2
- Implementing agency shall have an option to publish procurement notice without disclosing cost estimate. 2
- QCBS 2
- July 9 2010 3
- CQS 3
- Internatio nal Open 3
- RFB with post qualifi cation 3
- Substantia lly responsive and lowest evaluated cost 3
- Internatio nal Open 3
- RFB with 3
- Substantia lly 3
- July 9 2010 4
- July 9 2010 5
- 1. Prior Review Threshold 5
- Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants 5
- 2. Short list comprising entirely of national consultants 5
- 3. Any Other Special Selection Arrangements None 5
- CQS 5