Authors
- Disclosure Date
- 2024/10/10
- Disclosure Status
- Disclosed
- Doc Name
- Environmental and Social Impact Assessment Nepal Strategic Road Connectivity and Trade Improvement Project (P170409)
- Lending Instrument
- Investment Project Financing
- Pages
- 291
- Product Line
- IBRD/IDA
- Published in
- United States of America
- Rel Proj ID
- NP-Nepal Strategic Road Connectivity And Trade Improvement Project -- P170409
- TF No/Name
- TF0B1787-Boosting the Performance of Selected Key Corridors in Nepal,TF0B5118-Capacity building and implementation support to the National Road Safet
- Unit Owning
- Transport-SAR (ISAT1)
- Version Type
- Final
Table of Contents
- Environmental and Social Impact Assessment ESIA of East West Mahendra Highway Kamala-Dhalkebar-Pathlaiya Section 1
- EXECUTIVE SUMMARY 2
- Flora 5
- Critical Habitat 5
- Fauna 5
- Social and Cultural Environment 5
- Occupational Health and Safety Plan 40
- CHAPTERI PROJECT DESCRIPTION 44
- CHAPTER II LEGAL AND INSTITUTIONAL FRAMEWORK 66
- CHAPTER-III ESIA APPROACH AND METHODOLOGY 76
- CHAPTER-IV BASELINE ENVIRONMENTAL AND SOCIAL CONDITIONS 95
- As per the primary survey field observation and detailed consultations with wildlife department and local people major fauna found within the project area is listed in . 116
- CHAPTER-V STAKEHOLDER ENGAGEMENT AND PUBLIC CONSULTATIONS 159
- CHAPTER-VI ENVIRONMENT AND SOCIAL RISKS AND IMPACTS 175
- 100 kmph as per TOR 177
- Vibrations 217
- Dhalkebar Bardibas Lalbandi Nijgadh Chandrapur and Pathlaiya etc 223
- There will be no direct effect on them but construction noise and pollution will affect them indirectly. 227
- The detail of ecological issue of project is given in Biodiversity Management Plan. 227
- CHAPTER-VII ENVIRONMENT AND SOCIAL MANAGEMENT PLAN 229
- The general mitigation measures for road project are given in . 231
- The site-specific mitigation measures for road project are given in . 232
- CHAPTER-VIII ANALYSIS OF ALTERNATIVES 276
- CHAPTER- IX INSTITUTIONAL ARRANGEMENTS 284
- REFERENCES 289